Adams
Genesis Rail Services, LLC - Natchez Terminal, Natchez, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/03/2026.
|
Attala
Gulf South Pipeline Company LLC, Kosciusko Compressor Station, Kosciusko, MS was issued a new Air Construction Permit on 07/29/2026.
|
Bolivar
Cleveland Air Service Inc, Cleveland, MS applied for renewal of their Water State Operating Permit (SOP) on 08/04/2026.
|
Claiborne
NSLC Southern Inc, Hermanville, MS was issued a renewal of their Air Title V Permit on 08/11/2026.
|
Clarke
Enbridge Holdings Mississippi LLC, Former Harmony Gas Plant, Quitman, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/06/2026.
|
Copiah
BFEL Indemnitor Inc, Potter Production Facility, Wesson, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/03/2026.
|
|
Copiah Environmental Partners LLC, Panther Creek Surface Mine, Hazlehurst, MS applied for a modification to their mining general permit coverage on 08/05/2026.
|
|
Hazlehurst POTW, Lagoon, Hazlehurst, MS applied for renewal of their surface water discharge permit (NPDES) on 08/04/2026.
|
|
Matthew Owens, Poultry dba Owens 8 LLC, Wesson, MS was granted a new constuction general permit coverage on 08/11/2026.
|
|
Matthew Owens, Poultry dba Owens 8 LLC, Wesson, MS was granted a new Poultry AFO general permit coverage on 08/11/2026.
|
Covington
J W Stores LLC, T A Express of Mount Olive, Mount Olive, MS was granted a new constuction general permit coverage on 08/07/2026.
|
Desoto
Garden Street Communities Southeast, LLC, Fox Paw Creek, Olive Branch, MS was granted a new constuction general permit coverage on 07/29/2026.
|
|
M and R Builders LLC, Laurel Ridge Subdivision, Walls, MS applied for a new constuction general permit coverage on 07/24/2026.
|
|
Texas Gas Transmission LLC, Hydrostatic Test Discharge, Lake Cormorant, MS applied for a new hydrostatic general permit coverage on 08/13/2026.
|
|
Texas Gas Transmission LLC, Hydrostatic Test Discharge PN 16640, Horn Lake, MS was granted a new hydrostatic general permit coverage on 08/13/2026.
|
|
WestRock CP, LLC, Olive Branch, MS was issued a new water pretreatment permit on 07/21/2026.
|
Forrest
American Concrete Products MS Inc, Hattiesburg Plant, Hattiesburg, MS applied for a recoverage to their ready mix general permit coverage on 08/12/2026.
|
|
MDOT Pearl River/Forrest 109087/301000/302000, Pistol Ridge, MS was granted a new constuction general permit coverage on 08/03/2026.
|
|
Tennessee Gas Pipeline Company LLC, TGP 500-2 HDD Replacement, Hattiesburg, MS applied for a new hydrostatic general permit coverage on 08/11/2026.
|
|
USA Yeast Company LLC, Hattiesburg, MS applied for a modification to their Air Synthetic Minor Operating Permit (SMOP) on 07/30/2026.
|
George
George County Board of Supervisors, George County Industrial Park, Lucedale, MS applied for a new constuction general permit coverage on 08/03/2026.
|
Greene
Bernie Dearman, Poultry, Leakesville, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 07/21/2026.
|
|
Hart Farms Poultry and Cattle LLC, Leakesville, MS was granted a new Poultry AFO general permit coverage on 07/29/2026.
|
|
Holder Farms, Neely, MS applied for a new constuction general permit coverage on 08/03/2026.
|
|
Holder Farms, Neely, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 08/03/2026.
|
Harrison
68V Hidden Springs MS 2024 LLC, Falcon Glen, Biloxi, MS was granted an administrative modification to their Construction general permit coverage on 08/11/2026.
|
|
Beau Rivage Resorts LLC, Fallen Oak Golf Course, Saucier, MS applied for renewal of their Water State Operating Permit (SOP) on 07/30/2026.
|
|
Campbell and Dufriend Holding, LLC, Liberty Ridge, Saucier, MS was granted a new constuction general permit coverage on 07/20/2026.
|
|
City of Gulfport, Gulfport Commerce Cooridor, Gulfport, MS applied for a new constuction general permit coverage on 08/13/2026.
|
|
Gulf Coast Pre Stress Partners, LTD., Pass Christian, Pass Christian, MS applied for a recoverage to their ready mix general permit coverage on 08/13/2026.
|
|
Gulfport-Biloxi International Airport, Gulfport, MS was granted a new constuction general permit coverage on 08/05/2026.
|
Hinds
BUILD Renewables, LLC, Hinds Solar, LLC, Clinton, MS applied for a modification to their construction general permit coverage on 07/27/2026.
|
|
MS District UPC Camp Grounds, Raymond, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/11/2026.
|
Holmes
Gulf South Pipeline Company LLC, Holmes Compressor Station, Lexington, MS was issued a new Air Construction Permit on 08/06/2026.
|
Jackson
Chevron USA Inc, Chevron Products Company, Pascagoula Refinery, Pascagoula, MS applied for a air construction permit on 08/04/2026.
|
|
Gautier Kar Wash Inc, Gautier, MS applied for renewal of their surface water discharge permit (NPDES) on 07/27/2026.
|
|
MDOT, Interstate 10 Welcome Center, Moss Point, MS applied for renewal of their surface water discharge permit (NPDES) on 08/05/2026.
|
|
Signet Maritime Corporation, Signet Shipbuilding and Repair, Pascagoula, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 07/27/2026.
|
|
Waste Oil Collectors Inc, Gautier, MS was issued a renewal of their water pretreatment permit on 08/10/2026.
|
Jefferson Davis
Billy Jack Norris Jr Poultry, Bassfield, MS was granted a new Poultry AFO general permit coverage on 07/28/2026.
|
|
Billy Jack Norris Jr Poultry, Bassfield, MS was granted a new constuction general permit coverage on 07/28/2026.
|
|
Holiday Creek Farms LLC, Carson, MS was granted an administrative modification to their Construction general permit coverage on 07/27/2026.
|
|
Holiday Creek Farms LLC, Carson, MS was granted an administrative modification to their Dry Litter Poultry AFO general permit coverage on 07/27/2026.
|
|
Tyler Sanford Farms, Prentiss, MS applied for a new Poultry AFO general permit coverage on 07/20/2026.
|
|
Tyler Sanford Farms, Prentiss, MS applied for a new constuction general permit coverage on 07/27/2026.
|
Jones
Boe Farms LLC, Moselle, MS applied for renewal of their Water State Operating Permit (SOP) on 08/06/2026.
|
|
Patterson Brothers Poultry LLC, Moselle, MS was granted a new constuction general permit coverage on 08/10/2026.
|
|
Patterson Farms LLC, Moselle, MS was granted a new Poultry AFO general permit coverage on 08/10/2026.
|
|
Patterson Farms LLC, Moselle, MS was granted a new constuction general permit coverage on 08/10/2026.
|
|
Wade Services Inc, Laurel, MS applied for renewal of their water pretreatment permit on 07/21/2026.
|
Lafayette
Callicutt Realty, Oxford Farms Drive Extension to Belk Drive, Oxford, MS applied for a new constuction general permit coverage on 08/10/2026.
|
|
Eagletee LLC, Taylor Golf, Taylor, MS was granted a new constuction general permit coverage on 08/05/2026.
|
|
Great River Utility Operating Company LLC, Wellsgate Subdivision, Oxford, MS applied for renewal of their surface water discharge permit (NPDES) on 07/28/2026.
|
|
The Hamlet at Metts Meadows, Oxford, MS was granted a new constuction general permit coverage on 08/04/2026.
|
|
WDG Oxford Land LLC, The Nola, Oxford, MS was granted a new constuction general permit coverage on 07/29/2026.
|
Lamar
Great River Utility Operating Company LLC, Forrest Hills Subdivision, Oak Grove, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/11/2026.
|
|
Rain CII Carbon LLC, Purvis, MS applied for renewal of their Air Title V Permit on 08/06/2026.
|
Lauderdale
AT&T Enterprises LLC, Meehan to Morton, Meehan, MS applied for a new constuction general permit coverage on 07/22/2026.
|
|
Bimbo Bakeries USA Inc, Meridian, MS was issued a renewal of their Air Title V Permit on 08/10/2026.
|
|
Poplar Springs Nursing Center, LLC, Meridian, MS applied for renewal of their surface water discharge permit (NPDES) on 07/24/2026.
|
Leake
BL Farm Poultry LLC, Carthage, MS was granted a new Poultry AFO general permit coverage on 07/29/2026.
|
|
BL Farm Poultry LLC, Carthage, MS was granted a new constuction general permit coverage on 07/29/2026.
|
|
Barry Pope, Poultry, Carthage, MS applied for a recoverage of a Poultry AFO general permit on 07/30/2026.
|
|
Don Wooten, Poultry, Carthage, MS applied for a recoverage of a Poultry AFO general permit on 07/23/2026.
|
|
Martha Sessums, Poultry, Lena, MS applied for a recoverage of a Poultry AFO general permit on 07/23/2026.
|
Lee
City of Verona, Old Town Crossing Development, Verona, MS applied for a new constuction general permit coverage on 07/30/2026.
|
|
James A Hodges Construction Inc, Shady Oaks Subdivision, Tupelo, MS applied for a new constuction general permit coverage on 08/11/2026.
|
|
Locust Land Development LLC, Treetop Development, Tupelo, MS applied for a new constuction general permit coverage on 08/10/2026.
|
|
T May Company Inc, TMCO Class I Rubbish Site, Saltillo, MS applied for a waste tire processor permit on 07/29/2026.
|
Leflore
Leflore County Board of Supervisors, Leflore County Municipal Solid Waste Landfill, Sidon, MS applied for a modification to their surface water discharge permit (NPDES) on 08/12/2026.
|
Lincoln
Wood Preserving Inc, Brookhaven, MS was issued a renewal of their water pretreatment permit on 08/03/2026.
|
Lowndes
Homes by Frye, Highland Hills, Caledonia, MS applied for a new constuction general permit coverage on 08/14/2026.
|
|
JV DMMC LLC, ADI Plant, Columbus, MS applied for a new ready mix general permit coverage on 08/06/2026.
|
|
Lowndes County Port Authority, East Bank Pad Site, Columbus, MS was granted a new constuction general permit coverage on 08/05/2026.
|
|
PACCAR Engine Company, Columbus, MS applied for renewal of their water pretreatment permit on 08/07/2026.
|
Madison
Entergy Mississippi LLC, Hoy Road Charity Church 230kV Rebuild Project, Madison, MS was granted a new constuction general permit coverage on 08/13/2026.
|
|
Fondren Construction, The Gallery, Phase 1, Madison, MS was granted an administrative modification to their Construction general permit coverage on 08/03/2026.
|
|
Highland Park Properties LLC, Highland Business Park Phase I, Canton, MS was granted a new constuction general permit coverage on 08/07/2026.
|
|
Madison County Economic Development Authority, Madison County Mega Site, Canton, MS applied for a new constuction general permit coverage on 08/06/2026.
|
Marion
Ham Farm LLC, Columbia, MS was granted a modification to their Dry Litter Poultry AFO general permit coverage on 08/04/2026.
|
Marshall
Chickasaw Marshall Investments, LLC, Chickasaw Business Center, Byhalia, MS was granted a modification to their construction general permit coverage on 07/23/2026.
|
|
Marshall County Agricultural Center Site Development, Holly Springs, MS was granted a new constuction general permit coverage on 08/07/2026.
|
|
McDonald's USA LLC, McDonald's Restaurant Byhalia MS, Byhalia, MS applied for a new constuction general permit coverage on 07/23/2026.
|
|
Niagara Bottling LLC, Byhalia, MS applied for renewal of their water pretreatment permit on 07/23/2026.
|
|
Porter Construction MS LLC, Twin Lakes Subdivision, Mount Pleasant, MS was granted a modification to their construction general permit coverage on 07/27/2026.
|
Newton
East Central Community College, Solar Farm, Decatur, MS was granted a new constuction general permit coverage on 08/07/2026.
|
|
Thao Thu Dinh, Poultry, Lawrence, MS applied for a new Poultry AFO general permit coverage on 08/10/2026.
|
|
Thao Thu Dinh, Poultry, Lawrence, MS applied for a new constuction general permit coverage on 08/10/2026.
|
Noxubee
Big Rig Poultry Farm LLC, Shuqualak, MS was granted a new constuction general permit coverage on 08/10/2026.
|
|
Big Rig Poultry Farm LLC, Shuqualak, MS was granted a new Poultry AFO general permit coverage on 08/10/2026.
|
|
Carl Miller, Poultry dba Carl Miller Farm, Brooksville, MS was granted a new Poultry AFO general permit coverage on 07/28/2026.
|
|
Carl Miller, Poultry dba Carl Miller Farm, Brooksville, MS was granted a new constuction general permit coverage on 07/28/2026.
|
Oktibbeha
Greystar, College View at Mississippi State University, Starkville, MS was granted a modification to their construction general permit coverage on 07/30/2026.
|
|
Morgan Construction Company Inc, Sterling Ridge Phase 1, Starkville, MS applied for a new constuction general permit coverage on 08/05/2026.
|
|
TVA Starkville - Sturgis Red Hills Project, Sturgis, MS was granted a new constuction general permit coverage on 08/07/2026.
|
Panola
Magnolia Gravel and Sand LLC, Sandy Bluff Mine, Sardis, MS was granted a new mining general permit coverage on 08/06/2026.
|
|
The Korex Corporation, Korex Sardis Facility, Sardis, MS was issued a new Air Construction Permit on 07/29/2026.
|
Pearl River
Fortenberry Slaughter House Inc, Carriere, MS was issued a renewal of their surface water discharge permit (NPDES) on 07/28/2026.
|
Perry
Lal Mak Kim, Poultry, Petal, MS was granted an administrative modification to their Dry Litter Poultry AFO general permit coverage on 07/24/2026.
|
Pike
Lazy Creek Farms Inc, Summit, MS applied for a new constuction general permit coverage on 08/03/2026.
|
|
Lazy Creek Farms Inc, Summit, MS applied for a new Poultry AFO general permit coverage on 08/03/2026.
|
Pontotoc
Dusty Ward Construction LLC, South Pointe Subdivision, Randolph, MS was granted a new constuction general permit coverage on 07/28/2026.
|
|
Sherman POTW, Activated Sludge Facility, Sherman, MS applied for renewal of their surface water discharge permit (NPDES) on 08/11/2026.
|
Rankin
B and G Equipment Inc, Flowood, MS applied for a new constuction general permit coverage on 07/24/2026.
|
|
Biloxi Beach Group LLC, Number 2, Pelahatchie, MS applied for renewal of their Water State Operating Permit (SOP) on 08/05/2026.
|
|
Joe McGee Construction Company Inc, Richardson Mine, Brandon, MS was granted a new mining general permit coverage on 08/03/2026.
|
|
Linde Inc, Brandon, MS applied for renewal of their surface water discharge permit (NPDES) on 07/28/2026.
|
|
Lost Pine RGWM 2-3 Development, LLC, Lost Pine Phase 2, Flowood, MS was granted a modification to their construction general permit coverage on 08/05/2026.
|
|
MMC Materials Inc, Pearl Plant, Pearl, MS applied for a new ready mix general permit coverage on 07/29/2026.
|
|
North Brandon Shores Home Owners Association Inc, Brandon, MS applied for a new constuction general permit coverage on 07/31/2026.
|
|
Rankin First Economic Development Authority, West Rankin Industrial Park, Site Clearing Phase II, Pearl, MS applied for a new constuction general permit coverage on 07/30/2026.
|
|
Voith US, Inc., Florence, MS was issued a renewal of their Air Synthetic Minor Operating Permit (SMOP) on 07/29/2026.
|
Scott
Kimberly Pham, Poultry, Morton, MS applied for a new Poultry AFO general permit coverage on 08/13/2026.
|
|
Kimberly Pham, Poultry, Morton, MS applied for a new constuction general permit coverage on 08/13/2026.
|
|
Steven Benton, Poultry, Forest, MS applied for a new Poultry AFO general permit coverage on 08/05/2026.
|
|
Steven Benton, Poultry, Forest, MS applied for a new constuction general permit coverage on 08/05/2026.
|
Simpson
East Prong Farms, LLC, Mount Olive, MS applied for a new constuction general permit coverage on 07/28/2026.
|
|
East Prong Farms, LLC, Mount Olive, MS applied for a recoverage of a Poultry AFO general permit on 07/28/2026.
|
Smith
Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS was issued a renewal of their Air Title V Permit on 07/20/2026.
|
|
Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS applied for a new constuction general permit coverage on 07/24/2026.
|
|
Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS applied for a new hydrostatic general permit coverage on 07/28/2026.
|
|
Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS was granted a new hydrostatic general permit coverage on 07/30/2026.
|
|
Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS applied for a new hydrostatic general permit coverage on 08/06/2026.
|
State Wide
Ready Mix General Permit, State Wide, MS was granted a recoverage to their ready mix general permit coverage on 08/10/2026.
|
Stone
Anduril Industries Inc, McHenry, MS applied for a modification to their construction general permit coverage on 07/20/2026.
|
|
Tennessee Gas Pipeline Company LLC, TGP 500-2 HDD Crossing Project, Lumberton, MS was granted a new hydrostatic general permit coverage on 07/29/2026.
|
Tallahatchie
Wildwood Energy Storage LLC, Wildwood BESS, Tutwiler, MS applied for a new constuction general permit coverage on 07/31/2026.
|
Tate
Crystal Finishing Systems Inc, Senatobia, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 08/10/2026.
|
Tippah
Sunoco LLC, Ripley Bulk Plant, Ripley, MS applied for a new baseline general permit coverage on 07/27/2026.
|
Tishomingo
Marquise LLC, The Grove, Iuka, MS applied for a new constuction general permit coverage on 08/12/2026.
|
|
Patrick Industries Inc dba Baymont Inc, Belmont Facility, Belmont, MS was issued a renewal of their Air Title V Permit on 08/06/2026.
|
|
SHM Aqua Yacht LLC, dba Aqua Yacht Harbor, Iuka, MS was issued a modification to their water State Operating Permit (SOP) on 07/21/2026.
|
|
Skyline Steel LLC, Iuka, MS was granted a modification to their baseline general permit coverage on 08/04/2026.
|
Tunica
North Delta Dusters LLC, Tunica, MS was issued an administrative amendment to their water State Operating Permit (SOP) on 08/12/2026.
|
Value Needed
Tennessee Gas Pipeline Company LLC, Bellewood Compressor Station Number 602, Bellewood, MS was issued a new Air Construction Permit on 08/06/2026.
|
Walthall
Walthall County Board of Supervisors, Walthall County Transfer Station, Tylertown, MS was issued a new solid waste transfer permit on 07/27/2026.
|
Warren
Culkin Water Treatment Facility, Vicksburg, MS applied for renewal of their surface water discharge permit (NPDES) on 07/20/2026.
|
|
Entergy Mississippi LLC, Vicksburg Advanced Power Station (VAPS), Vicksburg, MS applied for a modification to their construction general permit coverage on 08/10/2026.
|
|
Hitachi Engergy USA Inc, Hitachi Energy Vicksburg, Vicksburg, MS applied for a new baseline general permit coverage on 07/23/2026.
|
|
Hitachi Engergy USA Inc, Hitachi Energy Vicksburg, Vicksburg, MS was granted a new baseline general permit coverage on 08/10/2026.
|
Washington
Greer Energy Storage, LLC, Hollandale, MS applied for a new constuction general permit coverage on 08/06/2026.
|
|
Leland POTW, Leland, MS applied for renewal of their surface water discharge permit (NPDES) on 08/11/2026.
|
Wayne
Lee E. McCollough, Poultry dba Dixie Farms, Waynesboro, MS was granted a recoverage of a Poultry AFO general permit on 08/05/2026.
|
|
Waynesboro POTW, Waynesboro, MS applied for a modification to their surface water discharge permit (NPDES) on 08/05/2026.
|
Winston
Glynn Barker, Poultry dba Triple B Farms, Louisville, MS was granted a new Poultry AFO general permit coverage on 08/03/2026.
|
Yazoo
AMCO Manufacturing Company LLC, Yazoo City, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 07/27/2026.
|
|
Tinsley Resources LLC, Tinsley Pipeline System, Tinsley, MS was issued a renewal of their Air Synthetic Minor Operating Permit (SMOP) on 08/13/2026.
|