Adams

Genesis Rail Services, LLC - Natchez Terminal, Natchez, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/03/2026.


Attala

Gulf South Pipeline Company LLC, Kosciusko Compressor Station, Kosciusko, MS was issued a new Air Construction Permit on 07/29/2026.


Bolivar

Cleveland Air Service Inc, Cleveland, MS applied for renewal of their Water State Operating Permit (SOP) on 08/04/2026.


Claiborne

NSLC Southern Inc, Hermanville, MS was issued a renewal of their Air Title V Permit on 08/11/2026.


Clarke

Enbridge Holdings Mississippi LLC, Former Harmony Gas Plant, Quitman, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/06/2026.


Copiah

BFEL Indemnitor Inc, Potter Production Facility, Wesson, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/03/2026.

Copiah Environmental Partners LLC, Panther Creek Surface Mine, Hazlehurst, MS applied for a modification to their mining general permit coverage on 08/05/2026.

Hazlehurst POTW, Lagoon, Hazlehurst, MS applied for renewal of their surface water discharge permit (NPDES) on 08/04/2026.

Matthew Owens, Poultry dba Owens 8 LLC, Wesson, MS was granted a new constuction general permit coverage on 08/11/2026.

Matthew Owens, Poultry dba Owens 8 LLC, Wesson, MS was granted a new Poultry AFO general permit coverage on 08/11/2026.


Covington

J W Stores LLC, T A Express of Mount Olive, Mount Olive, MS was granted a new constuction general permit coverage on 08/07/2026.


Desoto

Garden Street Communities Southeast, LLC, Fox Paw Creek, Olive Branch, MS was granted a new constuction general permit coverage on 07/29/2026.

M and R Builders LLC, Laurel Ridge Subdivision, Walls, MS applied for a new constuction general permit coverage on 07/24/2026.

Texas Gas Transmission LLC, Hydrostatic Test Discharge, Lake Cormorant, MS applied for a new hydrostatic general permit coverage on 08/13/2026.

Texas Gas Transmission LLC, Hydrostatic Test Discharge PN 16640, Horn Lake, MS was granted a new hydrostatic general permit coverage on 08/13/2026.

WestRock CP, LLC, Olive Branch, MS was issued a new water pretreatment permit on 07/21/2026.


Forrest

American Concrete Products MS Inc, Hattiesburg Plant, Hattiesburg, MS applied for a recoverage to their ready mix general permit coverage on 08/12/2026.

MDOT Pearl River/Forrest 109087/301000/302000, Pistol Ridge, MS was granted a new constuction general permit coverage on 08/03/2026.

Tennessee Gas Pipeline Company LLC, TGP 500-2 HDD Replacement, Hattiesburg, MS applied for a new hydrostatic general permit coverage on 08/11/2026.

USA Yeast Company LLC, Hattiesburg, MS applied for a modification to their Air Synthetic Minor Operating Permit (SMOP) on 07/30/2026.


George

George County Board of Supervisors, George County Industrial Park, Lucedale, MS applied for a new constuction general permit coverage on 08/03/2026.


Greene

Bernie Dearman, Poultry, Leakesville, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 07/21/2026.

Hart Farms Poultry and Cattle LLC, Leakesville, MS was granted a new Poultry AFO general permit coverage on 07/29/2026.

Holder Farms, Neely, MS applied for a new constuction general permit coverage on 08/03/2026.

Holder Farms, Neely, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 08/03/2026.


Harrison

68V Hidden Springs MS 2024 LLC, Falcon Glen, Biloxi, MS was granted an administrative modification to their Construction general permit coverage on 08/11/2026.

Beau Rivage Resorts LLC, Fallen Oak Golf Course, Saucier, MS applied for renewal of their Water State Operating Permit (SOP) on 07/30/2026.

Campbell and Dufriend Holding, LLC, Liberty Ridge, Saucier, MS was granted a new constuction general permit coverage on 07/20/2026.

City of Gulfport, Gulfport Commerce Cooridor, Gulfport, MS applied for a new constuction general permit coverage on 08/13/2026.

Gulf Coast Pre Stress Partners, LTD., Pass Christian, Pass Christian, MS applied for a recoverage to their ready mix general permit coverage on 08/13/2026.

Gulfport-Biloxi International Airport, Gulfport, MS was granted a new constuction general permit coverage on 08/05/2026.


Hinds

BUILD Renewables, LLC, Hinds Solar, LLC, Clinton, MS applied for a modification to their construction general permit coverage on 07/27/2026.

MS District UPC Camp Grounds, Raymond, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/11/2026.


Holmes

Gulf South Pipeline Company LLC, Holmes Compressor Station, Lexington, MS was issued a new Air Construction Permit on 08/06/2026.


Jackson

Chevron USA Inc, Chevron Products Company, Pascagoula Refinery, Pascagoula, MS applied for a air construction permit on 08/04/2026.

Gautier Kar Wash Inc, Gautier, MS applied for renewal of their surface water discharge permit (NPDES) on 07/27/2026.

MDOT, Interstate 10 Welcome Center, Moss Point, MS applied for renewal of their surface water discharge permit (NPDES) on 08/05/2026.

Signet Maritime Corporation, Signet Shipbuilding and Repair, Pascagoula, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 07/27/2026.

Waste Oil Collectors Inc, Gautier, MS was issued a renewal of their water pretreatment permit on 08/10/2026.


Jefferson Davis

Billy Jack Norris Jr Poultry, Bassfield, MS was granted a new Poultry AFO general permit coverage on 07/28/2026.

Billy Jack Norris Jr Poultry, Bassfield, MS was granted a new constuction general permit coverage on 07/28/2026.

Holiday Creek Farms LLC, Carson, MS was granted an administrative modification to their Construction general permit coverage on 07/27/2026.

Holiday Creek Farms LLC, Carson, MS was granted an administrative modification to their Dry Litter Poultry AFO general permit coverage on 07/27/2026.

Tyler Sanford Farms, Prentiss, MS applied for a new Poultry AFO general permit coverage on 07/20/2026.

Tyler Sanford Farms, Prentiss, MS applied for a new constuction general permit coverage on 07/27/2026.


Jones

Boe Farms LLC, Moselle, MS applied for renewal of their Water State Operating Permit (SOP) on 08/06/2026.

Patterson Brothers Poultry LLC, Moselle, MS was granted a new constuction general permit coverage on 08/10/2026.

Patterson Farms LLC, Moselle, MS was granted a new Poultry AFO general permit coverage on 08/10/2026.

Patterson Farms LLC, Moselle, MS was granted a new constuction general permit coverage on 08/10/2026.

Wade Services Inc, Laurel, MS applied for renewal of their water pretreatment permit on 07/21/2026.


Lafayette

Callicutt Realty, Oxford Farms Drive Extension to Belk Drive, Oxford, MS applied for a new constuction general permit coverage on 08/10/2026.

Eagletee LLC, Taylor Golf, Taylor, MS was granted a new constuction general permit coverage on 08/05/2026.

Great River Utility Operating Company LLC, Wellsgate Subdivision, Oxford, MS applied for renewal of their surface water discharge permit (NPDES) on 07/28/2026.

The Hamlet at Metts Meadows, Oxford, MS was granted a new constuction general permit coverage on 08/04/2026.

WDG Oxford Land LLC, The Nola, Oxford, MS was granted a new constuction general permit coverage on 07/29/2026.


Lamar

Great River Utility Operating Company LLC, Forrest Hills Subdivision, Oak Grove, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/11/2026.

Rain CII Carbon LLC, Purvis, MS applied for renewal of their Air Title V Permit on 08/06/2026.


Lauderdale

AT&T Enterprises LLC, Meehan to Morton, Meehan, MS applied for a new constuction general permit coverage on 07/22/2026.

Bimbo Bakeries USA Inc, Meridian, MS was issued a renewal of their Air Title V Permit on 08/10/2026.

Poplar Springs Nursing Center, LLC, Meridian, MS applied for renewal of their surface water discharge permit (NPDES) on 07/24/2026.


Leake

BL Farm Poultry LLC, Carthage, MS was granted a new Poultry AFO general permit coverage on 07/29/2026.

BL Farm Poultry LLC, Carthage, MS was granted a new constuction general permit coverage on 07/29/2026.

Barry Pope, Poultry, Carthage, MS applied for a recoverage of a Poultry AFO general permit on 07/30/2026.

Don Wooten, Poultry, Carthage, MS applied for a recoverage of a Poultry AFO general permit on 07/23/2026.

Martha Sessums, Poultry, Lena, MS applied for a recoverage of a Poultry AFO general permit on 07/23/2026.


Lee

City of Verona, Old Town Crossing Development, Verona, MS applied for a new constuction general permit coverage on 07/30/2026.

James A Hodges Construction Inc, Shady Oaks Subdivision, Tupelo, MS applied for a new constuction general permit coverage on 08/11/2026.

Locust Land Development LLC, Treetop Development, Tupelo, MS applied for a new constuction general permit coverage on 08/10/2026.

T May Company Inc, TMCO Class I Rubbish Site, Saltillo, MS applied for a waste tire processor permit on 07/29/2026.


Leflore

Leflore County Board of Supervisors, Leflore County Municipal Solid Waste Landfill, Sidon, MS applied for a modification to their surface water discharge permit (NPDES) on 08/12/2026.


Lincoln

Wood Preserving Inc, Brookhaven, MS was issued a renewal of their water pretreatment permit on 08/03/2026.


Lowndes

Homes by Frye, Highland Hills, Caledonia, MS applied for a new constuction general permit coverage on 08/14/2026.

JV DMMC LLC, ADI Plant, Columbus, MS applied for a new ready mix general permit coverage on 08/06/2026.

Lowndes County Port Authority, East Bank Pad Site, Columbus, MS was granted a new constuction general permit coverage on 08/05/2026.

PACCAR Engine Company, Columbus, MS applied for renewal of their water pretreatment permit on 08/07/2026.


Madison

Entergy Mississippi LLC, Hoy Road Charity Church 230kV Rebuild Project, Madison, MS was granted a new constuction general permit coverage on 08/13/2026.

Fondren Construction, The Gallery, Phase 1, Madison, MS was granted an administrative modification to their Construction general permit coverage on 08/03/2026.

Highland Park Properties LLC, Highland Business Park Phase I, Canton, MS was granted a new constuction general permit coverage on 08/07/2026.

Madison County Economic Development Authority, Madison County Mega Site, Canton, MS applied for a new constuction general permit coverage on 08/06/2026.


Marion

Ham Farm LLC, Columbia, MS was granted a modification to their Dry Litter Poultry AFO general permit coverage on 08/04/2026.


Marshall

Chickasaw Marshall Investments, LLC, Chickasaw Business Center, Byhalia, MS was granted a modification to their construction general permit coverage on 07/23/2026.

Marshall County Agricultural Center Site Development, Holly Springs, MS was granted a new constuction general permit coverage on 08/07/2026.

McDonald's USA LLC, McDonald's Restaurant Byhalia MS, Byhalia, MS applied for a new constuction general permit coverage on 07/23/2026.

Niagara Bottling LLC, Byhalia, MS applied for renewal of their water pretreatment permit on 07/23/2026.

Porter Construction MS LLC, Twin Lakes Subdivision, Mount Pleasant, MS was granted a modification to their construction general permit coverage on 07/27/2026.


Newton

East Central Community College, Solar Farm, Decatur, MS was granted a new constuction general permit coverage on 08/07/2026.

Thao Thu Dinh, Poultry, Lawrence, MS applied for a new Poultry AFO general permit coverage on 08/10/2026.

Thao Thu Dinh, Poultry, Lawrence, MS applied for a new constuction general permit coverage on 08/10/2026.


Noxubee

Big Rig Poultry Farm LLC, Shuqualak, MS was granted a new constuction general permit coverage on 08/10/2026.

Big Rig Poultry Farm LLC, Shuqualak, MS was granted a new Poultry AFO general permit coverage on 08/10/2026.

Carl Miller, Poultry dba Carl Miller Farm, Brooksville, MS was granted a new Poultry AFO general permit coverage on 07/28/2026.

Carl Miller, Poultry dba Carl Miller Farm, Brooksville, MS was granted a new constuction general permit coverage on 07/28/2026.


Oktibbeha

Greystar, College View at Mississippi State University, Starkville, MS was granted a modification to their construction general permit coverage on 07/30/2026.

Morgan Construction Company Inc, Sterling Ridge Phase 1, Starkville, MS applied for a new constuction general permit coverage on 08/05/2026.

TVA Starkville - Sturgis Red Hills Project, Sturgis, MS was granted a new constuction general permit coverage on 08/07/2026.


Panola

Magnolia Gravel and Sand LLC, Sandy Bluff Mine, Sardis, MS was granted a new mining general permit coverage on 08/06/2026.

The Korex Corporation, Korex Sardis Facility, Sardis, MS was issued a new Air Construction Permit on 07/29/2026.


Pearl River

Fortenberry Slaughter House Inc, Carriere, MS was issued a renewal of their surface water discharge permit (NPDES) on 07/28/2026.


Perry

Lal Mak Kim, Poultry, Petal, MS was granted an administrative modification to their Dry Litter Poultry AFO general permit coverage on 07/24/2026.


Pike

Lazy Creek Farms Inc, Summit, MS applied for a new constuction general permit coverage on 08/03/2026.

Lazy Creek Farms Inc, Summit, MS applied for a new Poultry AFO general permit coverage on 08/03/2026.


Pontotoc

Dusty Ward Construction LLC, South Pointe Subdivision, Randolph, MS was granted a new constuction general permit coverage on 07/28/2026.

Sherman POTW, Activated Sludge Facility, Sherman, MS applied for renewal of their surface water discharge permit (NPDES) on 08/11/2026.


Rankin

B and G Equipment Inc, Flowood, MS applied for a new constuction general permit coverage on 07/24/2026.

Biloxi Beach Group LLC, Number 2, Pelahatchie, MS applied for renewal of their Water State Operating Permit (SOP) on 08/05/2026.

Joe McGee Construction Company Inc, Richardson Mine, Brandon, MS was granted a new mining general permit coverage on 08/03/2026.

Linde Inc, Brandon, MS applied for renewal of their surface water discharge permit (NPDES) on 07/28/2026.

Lost Pine RGWM 2-3 Development, LLC, Lost Pine Phase 2, Flowood, MS was granted a modification to their construction general permit coverage on 08/05/2026.

MMC Materials Inc, Pearl Plant, Pearl, MS applied for a new ready mix general permit coverage on 07/29/2026.

North Brandon Shores Home Owners Association Inc, Brandon, MS applied for a new constuction general permit coverage on 07/31/2026.

Rankin First Economic Development Authority, West Rankin Industrial Park, Site Clearing Phase II, Pearl, MS applied for a new constuction general permit coverage on 07/30/2026.

Voith US, Inc., Florence, MS was issued a renewal of their Air Synthetic Minor Operating Permit (SMOP) on 07/29/2026.


Scott

Kimberly Pham, Poultry, Morton, MS applied for a new Poultry AFO general permit coverage on 08/13/2026.

Kimberly Pham, Poultry, Morton, MS applied for a new constuction general permit coverage on 08/13/2026.

Steven Benton, Poultry, Forest, MS applied for a new Poultry AFO general permit coverage on 08/05/2026.

Steven Benton, Poultry, Forest, MS applied for a new constuction general permit coverage on 08/05/2026.


Simpson

East Prong Farms, LLC, Mount Olive, MS applied for a new constuction general permit coverage on 07/28/2026.

East Prong Farms, LLC, Mount Olive, MS applied for a recoverage of a Poultry AFO general permit on 07/28/2026.


Smith

Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS was issued a renewal of their Air Title V Permit on 07/20/2026.

Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS applied for a new constuction general permit coverage on 07/24/2026.

Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS applied for a new hydrostatic general permit coverage on 07/28/2026.

Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS was granted a new hydrostatic general permit coverage on 07/30/2026.

Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS applied for a new hydrostatic general permit coverage on 08/06/2026.


State Wide

Ready Mix General Permit, State Wide, MS was granted a recoverage to their ready mix general permit coverage on 08/10/2026.


Stone

Anduril Industries Inc, McHenry, MS applied for a modification to their construction general permit coverage on 07/20/2026.

Tennessee Gas Pipeline Company LLC, TGP 500-2 HDD Crossing Project, Lumberton, MS was granted a new hydrostatic general permit coverage on 07/29/2026.


Tallahatchie

Wildwood Energy Storage LLC, Wildwood BESS, Tutwiler, MS applied for a new constuction general permit coverage on 07/31/2026.


Tate

Crystal Finishing Systems Inc, Senatobia, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 08/10/2026.


Tippah

Sunoco LLC, Ripley Bulk Plant, Ripley, MS applied for a new baseline general permit coverage on 07/27/2026.


Tishomingo

Marquise LLC, The Grove, Iuka, MS applied for a new constuction general permit coverage on 08/12/2026.

Patrick Industries Inc dba Baymont Inc, Belmont Facility, Belmont, MS was issued a renewal of their Air Title V Permit on 08/06/2026.

SHM Aqua Yacht LLC, dba Aqua Yacht Harbor, Iuka, MS was issued a modification to their water State Operating Permit (SOP) on 07/21/2026.

Skyline Steel LLC, Iuka, MS was granted a modification to their baseline general permit coverage on 08/04/2026.


Tunica

North Delta Dusters LLC, Tunica, MS was issued an administrative amendment to their water State Operating Permit (SOP) on 08/12/2026.


Value Needed

Tennessee Gas Pipeline Company LLC, Bellewood Compressor Station Number 602, Bellewood, MS was issued a new Air Construction Permit on 08/06/2026.


Walthall

Walthall County Board of Supervisors, Walthall County Transfer Station, Tylertown, MS was issued a new solid waste transfer permit on 07/27/2026.


Warren

Culkin Water Treatment Facility, Vicksburg, MS applied for renewal of their surface water discharge permit (NPDES) on 07/20/2026.

Entergy Mississippi LLC, Vicksburg Advanced Power Station (VAPS), Vicksburg, MS applied for a modification to their construction general permit coverage on 08/10/2026.

Hitachi Engergy USA Inc, Hitachi Energy Vicksburg, Vicksburg, MS applied for a new baseline general permit coverage on 07/23/2026.

Hitachi Engergy USA Inc, Hitachi Energy Vicksburg, Vicksburg, MS was granted a new baseline general permit coverage on 08/10/2026.


Washington

Greer Energy Storage, LLC, Hollandale, MS applied for a new constuction general permit coverage on 08/06/2026.

Leland POTW, Leland, MS applied for renewal of their surface water discharge permit (NPDES) on 08/11/2026.


Wayne

Lee E. McCollough, Poultry dba Dixie Farms, Waynesboro, MS was granted a recoverage of a Poultry AFO general permit on 08/05/2026.

Waynesboro POTW, Waynesboro, MS applied for a modification to their surface water discharge permit (NPDES) on 08/05/2026.


Winston

Glynn Barker, Poultry dba Triple B Farms, Louisville, MS was granted a new Poultry AFO general permit coverage on 08/03/2026.


Yazoo

AMCO Manufacturing Company LLC, Yazoo City, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 07/27/2026.

Tinsley Resources LLC, Tinsley Pipeline System, Tinsley, MS was issued a renewal of their Air Synthetic Minor Operating Permit (SMOP) on 08/13/2026.

« enSearch Online - Home

Disclaimer: The information found in enSearch Online is for informational purposes only. While the Department makes reasonable efforts to maintain the data accurately and in a timely manner, enSearch Online is not a legal substitute for the official administrative files of the Department and will from time to time contain information that is not as complete as the information contained in the full administrative file of the agency. Additionally, typographical errors may occur in the transcription of written or typed information into the enSearch Online database; therefore, care should be taken to confirm the information in the database with information in the agency's administrative files. If any conflict exists between information contained in the enSearch Online database and the official administrative files of the Department, the official administrative files of the Department should be considered the official record. Nor is the posting of information on enSearch Online intended to replace the traditional methods of publishing public notice of certain documents as required by State and Federal statutes and/or regulations. EnSearch Online is intended to enhance the public's access to basic agency information. If you wish to review the official public records of the Department, you should contact the Public Records Officer of the Department at :
attn:Public Records Officer,
Mississippi Department of Environmental Quality

PO Box 2261,
Jackson, MS 39225-2261,
Phone Number (601) 961-5758 or
(601) 961-5171,
Fax Number (601) 354-6356.