Callie Eubanks, Poultry, Ethel, MS applied for a new Poultry AFO general permit coverage on 08/13/2026.

Callie Eubanks, Poultry, Ethel, MS applied for a new constuction general permit coverage on 08/14/2026.

Texas Eastern Transmission LP, Kosciusko Compressor Station Number 202, Kosciusko, MS was issued a modification to their Air Title V Permit on 09/01/2026.


Benton

Hickory Flat POTW, Hickory Flat, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/17/2026.


Bolivar

Baxter Healthcare Corporation, Cleveland, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/03/2026.

Benoit Flying Service Inc, Benoit, MS applied for renewal of their Water State Operating Permit (SOP) on 09/02/2026.

Trunkline Gas Company LLC, Shaw Compressor Station, Shaw, MS applied for renewal of their Air Title V Permit on 08/25/2026.

US Army COE, Vicksburg District, Contract W912EE26FA05 611 Berms, Perthshire, MS was granted a new constuction general permit coverage on 08/26/2026.

Winstonville POTW, Winstonville, MS applied for renewal of their surface water discharge permit (NPDES) on 08/19/2026.


Carroll

Anel Corporation, Winona, MS was issued a new water pretreatment permit on 08/17/2026.


Chickasaw

Franklin Development Company LLC, Houston, MS was issued a renewal of their water pretreatment permit on 08/24/2026.

International Paper Company, Houston, Houston, MS was issued a renewal of their water pretreatment permit on 08/24/2026.

Moss and Associates LLC, Okolona Solar, Okolona, MS was granted a new constuction general permit coverage on 08/19/2026.


Claiborne

NSLC Southern Inc, Hermanville, MS was issued a renewal of their Air Title V Permit on 08/11/2026.


Clarke

Southern Natural Gas Company LLC, Enterprise Compressor Station, Enterprise, MS was issued a modification to their Air Title V Permit on 08/21/2026.


Clay

Prestage Farms Mississippi Inc, Feed Mill, West Point, MS was issued a renewal of their Water State Operating Permit (SOP) on 08/17/2026.


Copiah

J and M Gravel and Sand Company LLC, Hazlehurst Mine, Hazlehurst, MS was granted a new constuction general permit coverage on 08/27/2026.

Matthew Owens, Poultry dba Owens 8 LLC, Wesson, MS was granted a new Poultry AFO general permit coverage on 08/11/2026.

Matthew Owens, Poultry dba Owens 8 LLC, Wesson, MS was granted a new constuction general permit coverage on 08/11/2026.


Covington

Delta Farm LLC, Seminary, MS was granted a new constuction general permit coverage on 08/18/2026.

Delta Farm LLC, Seminary, MS was granted a new Poultry AFO general permit coverage on 08/18/2026.

Four J Farms LLC, Collins, MS was granted a new Poultry AFO general permit coverage on 09/01/2026.

Four J Farms LLC, Collins, MS was granted a new constuction general permit coverage on 09/01/2026.

J W Stores LLC, T A Express of Mount Olive, Mount Olive, MS was granted a new constuction general permit coverage on 08/07/2026.

Mississippi Hub, LLC - Mississippi Hub Booster Station, Collins, MS applied for a air construction permit on 08/19/2026.


Desoto

AT&T Enterprises, LLC, Hernando MS to Senatobia MS, Hernando, MS was granted a new constuction general permit coverage on 08/13/2026.

DeSoto County Regional Utility Authority, Olive Branch POTW Ross Road, Olive Branch, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/18/2026.

Desoto County Board of Supervisors, Getwell Road Widening, Nesbit, MS was granted a new constuction general permit coverage on 08/25/2026.

Desoto County School District, Career Technical Center East, Olive Branch, MS applied for a new constuction general permit coverage on 08/25/2026.

MZX Tech, Inc., Project Tulane, Southaven, MS was granted a new constuction general permit coverage on 08/18/2026.

Mainland MCA Olive Branch LLC, Parkview Heights PD, Phase 2, Area 3, Olive Branch, MS applied for a new constuction general permit coverage on 08/21/2026.

Packaging Corporation of America, Olive Branch, MS was issued a new water pretreatment permit on 09/01/2026.

Texas Gas Transmission LLC, Hydrostatic Test Discharge PN 15127, Lake Cormorant, MS applied for a new hydrostatic general permit coverage on 08/13/2026.

Texas Gas Transmission LLC, Hydrostatic Test Discharge PN 15127, Lake Cormorant, MS was granted a new hydrostatic general permit coverage on 08/24/2026.

Texas Gas Transmission LLC, Hydrostatic Test Discharge PN 16640, Horn Lake, MS was granted a new hydrostatic general permit coverage on 08/13/2026.

Winningham Estates Subdivision LLC, Southaven, MS was granted a modification to their construction general permit coverage on 08/20/2026.


Forrest

American Concrete Products MS Inc, Hattiesburg Plant, Hattiesburg, MS applied for a recoverage to their ready mix general permit coverage on 08/12/2026.

Arcosa Aggregates Gulf Coast LLC, Plant 1347, Hattiesburg, MS was granted an administrative modification to their Mining general permit coverage on 09/02/2026.

JJC Enterprises Inc, Oakland Ridge Duplexes, Petal, MS applied for renewal of their Water State Operating Permit (SOP) on 09/01/2026.

Pecan View Properties, LLC, Orchard Park Hattiesburg, Hattiesburg, MS was issued a new water State Operating Permit (SOP) on 08/18/2026.

Tennessee Gas Pipeline Company LLC, TGP 500-2 HDD Replacement, Hattiesburg, MS applied for a new hydrostatic general permit coverage on 08/11/2026.

Tennessee Gas Pipeline Company LLC, TGP 500-2 HDD Replacement, Hattiesburg, MS was granted a new hydrostatic general permit coverage on 08/25/2026.


Franklin

Franklin Ready Mix Concrete Inc, Number 4, Bude, MS applied for a recoverage to their ready mix general permit coverage on 08/31/2026.


Grenada

Greater Grenada Partnership, American Way 100 Acre Site, Grenada, MS was granted a new constuction general permit coverage on 08/26/2026.

Milwaukee Electric Tool Corporation, Milwaukee Tool-Grenada, Grenada, MS was issued a new Air Construction Permit on 09/03/2026.


Hancock

Hancock County Water and Sewer District, Port Bienville Industrial Park, Bay St. Louis, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/24/2026.

National Aeronautics and Space Administration, John C Stennis Space Center, Stennis Space Center, MS was issued a new water pretreatment permit on 08/26/2026.

Tennessee Gas Pipeline Company LLC, Bay St Louis Compressor Station Number 530, Bay St. Louis, MS applied for renewal of their Air Title V Permit on 08/27/2026.

Tennessee Gas Pipeline Company LLC, Bay St Louis Compressor Station Number 530, Bay St. Louis, MS was issued a new Air Construction Permit on 08/31/2026.


Harrison

20th State Energy, LLC, Gulfport, MS applied for a new baseline general permit coverage on 08/31/2026.

68V Hidden Springs MS 2024 LLC, Falcon Glen, Biloxi, MS was granted an administrative modification to their Construction general permit coverage on 08/11/2026.

Bottom 2 Top Construction LLC, Patriot Ridge Subdivision, Saucier, MS was granted an administrative modification to their Construction general permit coverage on 09/03/2026.

Fazzios Home and Farm Center Inc, Gulfport, MS applied for a recoverage to their ready mix general permit coverage on 08/24/2026.

Gulf Coast Pre Stress Partners, LTD., Pass Christian, Pass Christian, MS applied for a recoverage to their ready mix general permit coverage on 08/13/2026.

Gulfport, City of, Gulfport Commerce Corridor, Gulfport, MS applied for a new constuction general permit coverage on 08/13/2026.

Lacley, LLC, Coffee Creek Subdivison, Gulfport, MS was granted a new constuction general permit coverage on 08/20/2026.

Oldcastle APG South Inc, Gulfport, MS applied for a recoverage to their ready mix general permit coverage on 08/17/2026.


Hinds

American Block Co LLC, Jackson, Jackson, MS applied for a recoverage to their ready mix general permit coverage on 08/17/2026.

American Block Co LLC, Jackson, Jackson, MS was granted a recoverage to their ready mix general permit coverage on 08/31/2026.

BUILD Renewables, LLC, Hinds Solar, LLC, Clinton, MS was granted a modification to their construction general permit coverage on 08/20/2026.

EP Engineered Clays Corporation, Jackson, MS was issued a renewal of their Water State Operating Permit (SOP) on 09/01/2026.

Entergy Mississippi, LLC, Macaw 230-kV Station, Clinton, MS applied for a modification to their construction general permit coverage on 08/24/2026.

Gulf States Canners Inc, Clinton, MS applied for renewal of their water pretreatment permit on 09/03/2026.

MS District UPC Camp Grounds, Raymond, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/11/2026.


Holmes

Lexington Concrete and Block Company, Lexington Plant, Lexington, MS applied for a recoverage to their ready mix general permit coverage on 08/31/2026.

Phoenix Biochar MS LLC, Pickens, MS applied for a new baseline general permit coverage on 08/18/2026.

Phoenix Biochar MS LLC, Pickens, MS was granted a new baseline general permit coverage on 08/28/2026.

Phoenix Biochar MS LLC, Pickens, MS applied for a new constuction general permit coverage on 08/31/2026.


Humphreys

Delta Air Inc, Belzoni, MS applied for renewal of their Water State Operating Permit (SOP) on 08/24/2026.


Itawamba

Topline Manufacturing Company Inc, Tremont, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 08/27/2026.


Jackson

Moss Point Reverse Osmosis Water Plant, Moss Point, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/17/2026.

Ocean Springs School District, Ocean Springs Middle School, Ocean Springs, MS applied for a new constuction general permit coverage on 08/19/2026.

Waste Oil Collectors Inc, Gautier, MS was issued a renewal of their water pretreatment permit on 08/10/2026.


Jasper

McNeil Poultry Farms, LLC, Louin, MS was granted a new Poultry AFO general permit coverage on 09/03/2026.

McNeil Poultry Farms, LLC, Louin, MS was granted a new constuction general permit coverage on 09/03/2026.

Tri County Ready Mix Inc, Stringer Plant, Stringer, MS applied for a recoverage to their ready mix general permit coverage on 08/19/2026.

Tri County Ready Mix Inc, Stringer Plant, Stringer, MS was granted a recoverage to their ready mix general permit coverage on 08/31/2026.


Jefferson Davis

Waters Farms JDC LLC, Prentiss, MS applied for a new constuction general permit coverage on 08/24/2026.

Waters Farms JDC LLC, Prentiss, MS applied for a new Poultry AFO general permit coverage on 08/24/2026.

William R Magee, Poultry Farm 2, Prentiss, MS was granted a new Poultry AFO general permit coverage on 08/24/2026.

William R Magee, Poultry Farm 2, Prentiss, MS was granted a new constuction general permit coverage on 08/24/2026.


Jones

Hunt Southland Refining Company LLC, Heidelberg, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/19/2026.

Knight Farms LLC, Moselle, MS applied for a new Poultry AFO general permit coverage on 08/20/2026.

Knight Farms LLC, Moselle, MS applied for a new constuction general permit coverage on 08/20/2026.

PG Technologies LLC, Ellisville, MS applied for renewal of their water pretreatment permit on 08/18/2026.

Patterson Brothers Poultry LLC, Moselle, MS was granted a new constuction general permit coverage on 08/17/2026.

Patterson Brothers Poultry LLC, Moselle, MS was granted a new Poultry AFO general permit coverage on 08/17/2026.

Patterson Farms LLC, Moselle, MS was granted a new constuction general permit coverage on 08/10/2026.

Patterson Farms LLC, Moselle, MS was granted a new Poultry AFO general permit coverage on 08/10/2026.

Scarborough Farms LLC, Ovett, MS applied for a new constuction general permit coverage on 08/26/2026.

Scarborough Farms LLC, Ovett, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 08/26/2026.


Kemper

Stella Jones Corporation, Scooba, MS was issued a renewal of their Water State Operating Permit (SOP) on 09/01/2026.


Lafayette

ARCO Murray Construction Company, Stern Oxford Development, Oxford, MS applied for a new constuction general permit coverage on 08/25/2026.

Callicutt Realty, Oxford Farms Drive Extension to Belk Drive, Oxford, MS applied for a new constuction general permit coverage on 08/10/2026.

Highway 328 LLC, Yocona Rise, Oxford, MS was granted a new constuction general permit coverage on 08/24/2026.


Lamar

Epley Station, Hattiesburg, MS applied for a modification to their construction general permit coverage on 08/26/2026.

Great River Utility Operating Company LLC, Forrest Hills Subdivision, Oak Grove, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/11/2026.

Pat Harrison Waterway District, Little Black Creek Water Park, Lumberton, MS applied for renewal of their surface water discharge permit (NPDES) on 08/25/2026.


Lauderdale

AT&T Enterprises LLC, Hixon to Meehan, Meehan, MS applied for a new constuction general permit coverage on 08/31/2026.

Bimbo Bakeries USA Inc, Meridian, MS was issued a renewal of their Air Title V Permit on 08/10/2026.

Collinsville Water Association Inc, Collinsville, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/28/2026.

Cypress Farms Inc, Collinsville, MS was granted an administrative modification to their Dry Litter Poultry AFO general permit coverage on 09/03/2026.

Meridian East, Toomsbuba KOA Journey, Toomsuba, MS was issued an administrative amendment to their surface water discharge permit (NPDES) on 08/25/2026.

Sowashee Property Investments LLC, 33rd Street Development, Meridian, MS applied for a new constuction general permit coverage on 08/20/2026.


Lawrence

Lawrence County School District, Topeka Tilton Attendance Center, Monticello, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/17/2026.


Leake

A P Poultry Farm LLC, Carthage, MS was granted an administrative modification to their Dry Litter Poultry AFO general permit coverage on 09/01/2026.

Nicky Brantley, Poultry, Carthage, MS applied for a recoverage of a Poultry AFO general permit on 08/19/2026.


Lee

DUN-N-1 Travel Center, LLC, DUN-N-1 Travel Center, Tupelo, MS was granted a new constuction general permit coverage on 08/26/2026.

Gerald F Wiese, Natchez Trace RV Camp, Shannon, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/17/2026.

Independent Furniture Supply Company, Inc., Tupelo, MS applied for renewal of their Air Title V Permit on 08/27/2026.

James A Hodges Construction Inc, Shady Oaks Subdivision, Tupelo, MS applied for a new constuction general permit coverage on 08/11/2026.

KDM Customs, LLC, Tupelo, MS was issued a renewal of their Air Synthetic Minor Operating Permit (SMOP) on 08/26/2026.

Locust Land Development LLC, Treetop Development, Tupelo, MS applied for a new constuction general permit coverage on 08/10/2026.

ThermoSafe Technologies Inc, Tupelo, MS was granted an administrative modification to their Baseline general permit coverage on 08/27/2026.

ThermoSafe Technologies Inc, Tupelo, MS was issued an administrative modification to their water pretreatment permit on 08/27/2026.


Leflore

Leflore County Board of Supervisors, Leflore County Municipal Solid Waste Landfill, Sidon, MS applied for a modification to their surface water discharge permit (NPDES) on 08/12/2026.


Lincoln

MMC Materials Inc, Brookhaven, Brookhaven, MS applied for a recoverage to their ready mix general permit coverage on 08/31/2026.


Lowndes

Great River Utility Operating Company LLC, First Colony Subdivision, Columbus, MS applied for renewal of their surface water discharge permit (NPDES) on 08/12/2026.

Homes by Frye, Highland Hills, Caledonia, MS applied for a new constuction general permit coverage on 08/14/2026.

PACCAR Engine Company, Columbus, MS applied for renewal of their water pretreatment permit on 08/07/2026.

Steel Dynamics Columbus LLC, Columbus, MS applied for renewal of their surface water discharge permit (NPDES) on 08/19/2026.


Madison

Amazon Data Services Inc, Project Atlas JAN 200 Phase II, Ridgeland, MS was granted a new constuction general permit coverage on 08/14/2026.

Birdsong Construction, County Line Substation, Ridgeland, MS was granted a modification to their construction general permit coverage on 08/14/2026.

DR Horton, Inc, Birmingham, White Oak Farms, Canton, MS was granted a modification to their construction general permit coverage on 08/28/2026.

Entergy Mississippi LLC, Hoy Road Charity Church 230kV Rebuild Project, Madison, MS was granted a new constuction general permit coverage on 08/13/2026.

Entergy Mississippi LLC, Traceview Advanced Power Station, Ridgeland, MS was granted a modification to their construction general permit coverage on 08/19/2026.

Entergy Mississippi LLC, Traceview Advanced Power Station, Ridgeland, MS was granted a new constuction general permit coverage on 08/24/2026.

Entergy Mississippi, LLC, Entergy County Line Substation, Project Atlas, Ridgeland, MS was granted a modification to their construction general permit coverage on 08/14/2026.

Highland Park Properties LLC, Highland Business Park Phase I, Canton, MS was granted a new constuction general permit coverage on 08/07/2026.

Lexington Concrete and Block Company, Canton Plant, Canton, MS applied for a recoverage to their ready mix general permit coverage on 08/31/2026.

Madison County Economic Development Authority, Project Harvest Line, Madison, MS was granted a new constuction general permit coverage on 08/28/2026.

Madison Livingston LLC, The Cottages at Livingston, Madison, MS applied for a new constuction general permit coverage on 08/31/2026.

O B Curtis Water Treatment Plant, Ridgeland, MS applied for renewal of their surface water discharge permit (NPDES) on 08/28/2026.

The Haskell Company, JAN 200 Haskell, Ridgeland, MS was granted a modification to their construction general permit coverage on 08/14/2026.


Marion

Benjamin Family Farm LLC, Sandy Hook, MS applied for a new constuction general permit coverage on 08/27/2026.

Columbia POTW, North, Columbia, MS was issued a renewal of their surface water discharge permit (NPDES) on 08/18/2026.


Marshall

AC Polymers Inc, Byhalia, MS applied for a modification to their water pretreatment permit on 08/20/2026.

Lexington Concrete and Block Company, Byhalia Plant, Byhalia, MS applied for a recoverage to their ready mix general permit coverage on 08/31/2026.

Marshall County Agricultural Center Site Development, Holly Springs, MS was granted a new constuction general permit coverage on 08/07/2026.

McDonalds Real Estate Company, McDonald's Restaurant Byhalia MS, Byhalia, MS was granted a new constuction general permit coverage on 08/24/2026.


Monroe

Monroe County Chamber of Commerce, Project Keystone, The Lumber Manufactory, Sawmill, Amory, MS applied for a new constuction general permit coverage on 09/01/2026.

Monroe Gas Storage Company LLC, Monroe Gas Storage Facility, Amory, MS was issued a new Air Title V Permit on 09/01/2026.

Westlake Compounds LLC, Aberdeen, MS was issued an administrative modification to their water pretreatment permit on 08/24/2026.


Neshoba

Weyerhaeuser NR Company, Philadelphia Facility, Philadelphia, MS applied for renewal of their water pretreatment permit on 08/26/2026.


Newton

East Central Community College, Solar Farm, Decatur, MS was granted a new constuction general permit coverage on 08/07/2026.

Thao Thu Dinh, Poultry, Lawrence, MS applied for a new constuction general permit coverage on 08/10/2026.

Thao Thu Dinh, Poultry, Lawrence, MS applied for a new Poultry AFO general permit coverage on 08/10/2026.


Noxubee

Big Rig Poultry Farm LLC, Shuqualak, MS was granted a new constuction general permit coverage on 08/10/2026.

Big Rig Poultry Farm LLC, Shuqualak, MS was granted a new Poultry AFO general permit coverage on 08/10/2026.

Noxubee County Producers Inc, Superior Fish Products, Macon, MS applied for renewal of their surface water discharge permit (NPDES) on 08/31/2026.


Oktibbeha

MDOT, Oktibbeha 109518/301000, Maben, MS was granted a new constuction general permit coverage on 08/31/2026.

Mississippi State University, Wingo Way Construction, Starkville, MS was granted a new constuction general permit coverage on 08/31/2026.

TVA Starkville - Sturgis Red Hills Project, Sturgis, MS was granted a new constuction general permit coverage on 08/07/2026.


Panola

B and B Concrete Co Inc, Batesville, Batesville, MS applied for a new constuction general permit coverage on 08/21/2026.


Pike

Gulf South Pipeline Company LLC, PN 17629 1302 Bogue Chitto HDD, Summit, MS applied for a new hydrostatic general permit coverage on 08/20/2026.

Gulf South Pipeline Company LLC, PN 17629 1302 Bogue Chitto HDD, Summit, MS was granted a new hydrostatic general permit coverage on 08/31/2026.

Illinois Central Railroad Company CN, McComb Yard, McComb, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/01/2026.

Southwest Ready Mix Concrete Inc, Summit, MS applied for a recoverage to their ready mix general permit coverage on 08/24/2026.


Pontotoc

Sherman POTW, Activated Sludge Facility, Sherman, MS applied for renewal of their surface water discharge permit (NPDES) on 08/11/2026.


Rankin

Entergy Mississippi Inc, ADP Rankin Transmission Line Project, Brandon, MS applied for a new constuction general permit coverage on 08/26/2026.

Lexington Concrete and Block Company, Pearl Plant, Pearl, MS applied for a recoverage to their ready mix general permit coverage on 08/31/2026.

Old South Excavation LLC, Coday Mine, Brandon, MS applied for a modification to their mining general permit coverage on 08/17/2026.

Pinelands LLC, Flowood, MS applied for a modification to their construction general permit coverage on 08/25/2026.

S and S Builders of MS Inc, Grants Ridge, Brandon, MS applied for a modification to their construction general permit coverage on 08/17/2026.

Southern Natural Gas Company LLC, Rankin Compressor Station, Brandon, MS was issued a renewal of their Air Title V Permit on 08/21/2026.


Scott

AT&T Enterprises LLC, Morton to Vicksburg, Morton, MS applied for a new constuction general permit coverage on 09/01/2026.

Devon Weems, Poultry, Forest, MS applied for a new Poultry AFO general permit coverage on 08/28/2026.

Devon Weems, Poultry, Forest, MS applied for a new constuction general permit coverage on 08/28/2026.

Kimberly Pham, Poultry, Morton, MS applied for a new constuction general permit coverage on 08/13/2026.

Kimberly Pham, Poultry, Morton, MS applied for a new Poultry AFO general permit coverage on 08/13/2026.


Simpson

Lexington Concrete and Block Company, Mendenhall Plant, Mendenhall, MS applied for a recoverage to their ready mix general permit coverage on 08/31/2026.


Smith

Cooperative Energy, a Mississippi electric cooperative, Sylvarena Generating Plant, Bay Springs, MS applied for renewal of their Air Title V Permit on 08/19/2026.

Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS was granted a new hydrostatic general permit coverage on 08/18/2026.

Leaf River Energy Center LLC, Leaf River Energy Center, Taylorsville, MS applied for a modification to their Air Title V Permit on 09/03/2026.


State Wide

Ready Mix General Permit, State Wide, MS was granted a recoverage to their ready mix general permit coverage on 08/10/2026.


Stone

Trinity Funeral Services LLC, McHenry, MS was issued a new Air Construction Permit on 08/17/2026.


Tallahatchie

North Central Baptist Association Inc, dba Lakeside Baptist Assembly, Camp Lakeside, Scobey, MS applied for renewal of their Water State Operating Permit (SOP) on 08/19/2026.


Tate

Crystal Finishing Systems Inc, Senatobia, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 08/10/2026.

Trunkline Gas Company, LLC, Independence Compressor Station, Coldwater, MS applied for renewal of their Air Title V Permit on 08/25/2026.


Tishomingo

Marquise LLC, The Grove, Iuka, MS applied for a new constuction general permit coverage on 08/12/2026.

Patrick Industries, Inc. dba Baymont Bathware, Belmont, MS was issued an administrative amendment to their Air Title V permit on 09/01/2026.


Tunica

North Delta Dusters LLC, Tunica, MS was issued an administrative amendment to their water State Operating Permit (SOP) on 08/12/2026.


Union

Great River Utility Operating Company LLC, TangleRidge Village, New Albany, MS applied for renewal of their surface water discharge permit (NPDES) on 08/12/2026.


Walthall

Transcontinental Gas Pipeline Company LLC, Station 70, Tylertown, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/02/2026.


Warren

Entergy Mississippi LLC, Vicksburg Advanced Power Station (VAPS), Vicksburg, MS applied for a modification to their construction general permit coverage on 08/10/2026.

Ergon Refining Inc, Vicksburg, MS was issued a modification to their surface water discharge permit (NPDES) on 08/19/2026.

Ergon Refining Inc, Vicksburg, MS applied for renewal of their Air Title V Permit on 08/28/2026.

Great River Utility Operating Company, LLC, Dogwood Lake Estates, Vicksburg, MS applied for renewal of their surface water discharge permit (NPDES) on 08/12/2026.

Hitachi Engergy USA Inc, Hitachi Energy Vicksburg, Vicksburg, MS was granted a new baseline general permit coverage on 08/10/2026.


Washington

ANR Pipeline Company, Greenville Compressor Station, Greenville, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/02/2026.

Leland POTW, Leland, MS applied for renewal of their surface water discharge permit (NPDES) on 08/11/2026.

Producers Rice Mill Inc, Greenville, MS was issued a renewal of their Air Synthetic Minor Operating Permit (SMOP) on 08/19/2026.


Wayne

Pat Harrison Waterway District, Maynor Creek Water Park, Waynesboro, MS applied for renewal of their surface water discharge permit (NPDES) on 08/25/2026.

Southeast Ready Mix Inc, Waynesboro, MS applied for a recoverage to their ready mix general permit coverage on 08/31/2026.


Wilkinson

Fred Netterville Lumber Company, Woodville, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/01/2026.


Winston

Baker Ready Mix & Construction, LLC, Louisville, MS applied for a recoverage to their ready mix general permit coverage on 08/28/2026.

MDOT, Louisville Maintenance Headquarters, Louisville, MS applied for renewal of their Water State Operating Permit (SOP) on 08/13/2026.


Yazoo

Tinsley Resources LLC, Tinsley Pipeline System, Tinsley, MS was issued a renewal of their Air Synthetic Minor Operating Permit (SMOP) on 08/13/2026.

« enSearch Online - Home

Disclaimer: The information found in enSearch Online is for informational purposes only. While the Department makes reasonable efforts to maintain the data accurately and in a timely manner, enSearch Online is not a legal substitute for the official administrative files of the Department and will from time to time contain information that is not as complete as the information contained in the full administrative file of the agency. Additionally, typographical errors may occur in the transcription of written or typed information into the enSearch Online database; therefore, care should be taken to confirm the information in the database with information in the agency's administrative files. If any conflict exists between information contained in the enSearch Online database and the official administrative files of the Department, the official administrative files of the Department should be considered the official record. Nor is the posting of information on enSearch Online intended to replace the traditional methods of publishing public notice of certain documents as required by State and Federal statutes and/or regulations. EnSearch Online is intended to enhance the public's access to basic agency information. If you wish to review the official public records of the Department, you should contact the Public Records Officer of the Department at :
attn:Public Records Officer,
Mississippi Department of Environmental Quality

PO Box 2261,
Jackson, MS 39225-2261,
Phone Number (601) 961-5758 or
(601) 961-5171,
Fax Number (601) 354-6356.