Adams
Genesis Rail Services LLC, Natchez Terminal, Natchez, MS applied for a modification to their Air Synthetic Minor Operating Permit (SMOP) on 10/14/2025.
|
|
Natchez Business Ventures LLC, Plantation Mobile Home Park, Natchez, MS applied for renewal of their surface water discharge permit (NPDES) on 09/25/2025.
|
|
Tracetown Shopping Center, Natchez, MS was granted a new constuction general permit coverage on 10/09/2025.
|
|
Willow Creek Management LLC, Natchez, MS applied for renewal of their surface water discharge permit (NPDES) on 10/23/2025.
|
Alcorn
Corinth POTW, Corinth, MS was issued a modification to their surface water discharge permit (NPDES) on 10/14/2025.
|
Attala
Attala Steel Industries LLC, Kosciusko, MS was issued a new water pretreatment permit on 09/29/2025.
|
|
Attala Steel Industries LLC, Kosciusko, MS applied for renewal of their Water State Operating Permit (SOP) on 10/20/2025.
|
Bolivar
Black and Veatch Corporation, Delta Solar Photovoltaic Generating Facility Project, Cleveland, MS applied for a new constuction general permit coverage on 10/08/2025.
|
|
McCreary Flying Service LLC, Alligator, MS applied for renewal of their Water State Operating Permit (SOP) on 09/26/2025.
|
|
McCreary Flying Service LLC, Alligator, MS was issued a renewal of their Water State Operating Permit (SOP) on 10/10/2025.
|
Claiborne
Entergy Mississippi, LLC, Vicksburg Guild Part 2 Distribution Project, Port Gibson, MS applied for a new constuction general permit coverage on 09/29/2025.
|
Clarke
Southern Natural Gas Company LLC, Enterprise Compressor Station, Enterprise, MS applied for renewal of their surface water discharge permit (NPDES) on 09/29/2025.
|
|
Stonewall POTW, Stonewall, MS was issued a renewal of their surface water discharge permit (NPDES) on 10/16/2025.
|
Copiah
Central MS Rubbish LLC, Central MS Rubbish Class I Rubbish, Crystal Springs, MS was granted a modification to their baseline general permit coverage on 10/13/2025.
|
Covington
Chevron USA, Inc, DBA Chevron Products Company, Collins Terminal, Collins, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 09/26/2025.
|
|
Kinder Morgan Southeast Terminals LLC, Collins Terminal, Collins, MS was granted a new baseline general permit coverage on 09/25/2025.
|
|
MDOT, Covington, 109363 301000, Collins, MS applied for a new constuction general permit coverage on 10/08/2025.
|
|
TransMontaigne Operating Company LP, Collins Southeast Terminal, Collins, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 10/06/2025.
|
Desoto
Bridgforth Properties, Bridgforth Road Estates, Olive Branch, MS was granted a new constuction general permit coverage on 10/09/2025.
|
|
ChrisJon Development, LLC, Rosewood, Olive Branch, MS was granted a new constuction general permit coverage on 10/09/2025.
|
|
Forest Hill Community, Olive Branch, MS was granted a modification to their construction general permit coverage on 10/09/2025.
|
|
Land Grant, LLC, Olive Branch Industrial, Olive Branch, MS was granted a new constuction general permit coverage on 10/03/2025.
|
|
Laney Funderbunk Family, LP, The Preserve Subdivision, Hernando, MS was granted a new constuction general permit coverage on 10/08/2025.
|
|
MZX Tech LLC, Southaven, MS was granted a new constuction general permit coverage on 10/10/2025.
|
|
Overland Contracting Inc, Entergy Penton Solar Photovoltaic Generating Facility Project, Lake Cormorant, MS applied for a new constuction general permit coverage on 10/07/2025.
|
|
Yaser Saleh Sal Krown Investment, LLC,Progress Way, Hacks Cross Road Truck Stop, Olive Branch, MS was granted a new constuction general permit coverage on 10/07/2025.
|
Forrest
98 Waste and Recycling, LLC, 98 Waste Class I Rubbish Disposal Site, Hattiesburg, MS was granted a new baseline general permit coverage on 10/06/2025.
|
|
Camp Shelby Joint Forces Training Center, Lake Janney Wet Gap Project, Camp Shelby, MS was granted a new constuction general permit coverage on 10/10/2025.
|
|
Camp Shelby Joint Forces Training Center, Lake Janney Wet Gap Project, Camp Shelby, MS was issued a Water Quality 401 Certification on 10/17/2025.
|
|
Dennis Pierce, Inc, Cedar Crest, Hattiesburg, MS applied for a new constuction general permit coverage on 09/29/2025.
|
|
Great River Utility Operating Company LLC, Reese Creek Lagoon, Petal, MS was issued a renewal of their surface water discharge permit (NPDES) on 10/14/2025.
|
|
USA Yeast Company LLC, Hattiesburg, MS was granted a new baseline general permit coverage on 09/25/2025.
|
Greene
Mississippi Department of Corrections, South Mississippi Correctional Institution, Leakesville, MS applied for renewal of their surface water discharge permit (NPDES) on 10/20/2025.
|
Harrison
CCSL Biloxi LLC, dba Gulf Coast Laundry Services, Gulfport, MS applied for renewal of their water pretreatment permit on 09/26/2025.
|
|
Cavenham Forest Industries LLC, Gulfport, MS applied for renewal of their surface water discharge permit (NPDES) on 09/30/2025.
|
|
F & M Ventures, LLC - Mandala Development, D'Iberville, MS applied for a new constuction general permit coverage on 09/29/2025.
|
|
Gulf Coast 7th Day Adventist Church, Biloxi, MS was issued a renewal of their surface water discharge permit (NPDES) on 10/24/2025.
|
|
Harrison County Utility Authority, Tradition Development, Woolmarket, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/26/2025.
|
|
Ports America, West Pier Parking Area, Gulfport, MS was granted a new constuction general permit coverage on 10/22/2025.
|
|
Waste Management of Mississippi Inc, Pecan Grove Landfill and Recycling Center and Rubbish Site, Pass Christian, MS applied for a modification to their solid waste municipal landfill permit on 10/01/2025.
|
Hinds
Amazon Services LLC, WMS1, Jackson, MS was granted a new baseline general permit coverage on 09/25/2025.
|
|
Byram, City of, CDBG Drainage Improvements Project, Byram, MS was granted a new constuction general permit coverage on 09/30/2025.
|
|
Cintas Corporation, Jackson, MS applied for renewal of their water pretreatment permit on 10/08/2025.
|
|
Dyas Construction, Inc, UPS Jackson Mississippi, Jackson, MS applied for a new constuction general permit coverage on 09/30/2025.
|
|
Entergy Corporation, South Utica 6Y03, Utica, MS was granted a modification to their construction general permit coverage on 10/17/2025.
|
|
Hinds County Economic Development Authority, Delphi Site, Clinton Substation, Clinton, MS was granted a new constuction general permit coverage on 10/07/2025.
|
|
Jordan Estates, Jackson, MS applied for a new constuction general permit coverage on 10/09/2025.
|
|
Raymond POTW, East, Raymond, MS applied for renewal of their surface water discharge permit (NPDES) on 10/03/2025.
|
Humphreys
Catfish Processors LLC, Belzoni, MS was issued a renewal of their surface water discharge permit (NPDES) on 10/14/2025.
|
Jackson
Chevron USA Inc, Chevron Products Company, Pascagoula Refinery, Pascagoula, MS applied for a air construction permit on 10/16/2025.
|
|
Grantman MS, LLC, Creekwood Subdivision, St. Martin, MS applied for a new constuction general permit coverage on 10/05/2025.
|
|
Oak Capital LLC, The Trails, Ocean Springs, MS applied for a new constuction general permit coverage on 09/30/2025.
|
|
SL Coastal LLC, Crane Landing Subdivision, Ocean Springs, MS applied for a modification to their construction general permit coverage on 10/09/2025.
|
Jefferson Davis
Jacob Pack dba Big Valley Farm, Prentiss, MS applied for a new constuction general permit coverage on 09/26/2025.
|
|
Jacob Pack dba Big Valley Farm, Prentiss, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 09/26/2025.
|
|
Kenny Speed, Poultry dba 4S Farms, Carson, MS applied for a new constuction general permit coverage on 09/26/2025.
|
|
Kenny Speed, Poultry dba 4S Farms, Carson, MS applied for a new Poultry AFO general permit coverage on 09/26/2025.
|
Kemper
Kemper County Landfill Company, LLC, a subsidiary of Waste Pro of Mississippi Inc, DeKalb, MS applied for a modification to their solid waste municipal landfill permit on 09/29/2025.
|
Lafayette
L and M Holdings LLC, Lafayette Landing Subdivision, Oxford, MS was granted a new constuction general permit coverage on 10/01/2025.
|
|
LCD Acquisitions, LLC, The Station At Oxford, Oxford, MS was granted a new constuction general permit coverage on 10/22/2025.
|
|
Walker and Walker Enterprises LLC, Walnut Grove, Oxford, MS applied for a new constuction general permit coverage on 10/14/2025.
|
Lamar
Bass Memorial Academy, Adventist Health Center, Lumberton, MS was issued a renewal of their surface water discharge permit (NPDES) on 10/16/2025.
|
|
Lamar County School District, Oak Grove High School, Hattiesburg, MS was issued a renewal of their Water State Operating Permit (SOP) on 09/25/2025.
|
Lauderdale
Collinsville Water Association Inc, Collinsville Shopping Center and Subdivision, Collinsville, MS applied for renewal of their surface water discharge permit (NPDES) on 10/15/2025.
|
|
Jason Wiggins Mobile Home Park, Meridian, MS applied for renewal of their Water State Operating Permit (SOP) on 10/09/2025.
|
|
Jason Wiggins Mobile Home Park, Meridian, MS was issued a renewal of their Water State Operating Permit (SOP) on 10/24/2025.
|
|
QuikTrip Corporation, QuikTrip 7257, Meridian, MS was granted a new constuction general permit coverage on 10/06/2025.
|
Lawrence
Georgia Pacific Monticello LLC, Monticello, MS applied for a modification to their construction general permit coverage on 10/06/2025.
|
Lee
Auto Parts Manufacturing Mississippi Inc, Guntown, MS was issued a renewal of their water pretreatment permit on 10/01/2025.
|
|
H M Richards Inc, Guntown, MS applied for a modification to their Air Synthetic Minor Operating Permit (SMOP) on 10/13/2025.
|
|
MTD Products Company, Verona, MS was issued a renewal of their water pretreatment permit on 10/06/2025.
|
|
Tecumseh Compressor Company, Verona, MS was issued a renewal of their water pretreatment permit on 10/06/2025.
|
|
Tupelo Airport Authority, Tupelo, MS was granted a new baseline general permit coverage on 09/25/2025.
|
Leflore
Leflore County Board of Supervisors, Leflore County Municipal Solid Waste Landfill, Sidon, MS applied for a modification to their solid waste municipal landfill permit on 10/20/2025.
|
Lincoln
Country Meat Market of Brookhaven Inc, Brookhaven, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/29/2025.
|
|
Miskelly Farm LLC, Ruth, MS was granted a new constuction general permit coverage on 10/06/2025.
|
|
Miskelly Farm LLC, Ruth, MS was granted a new Poultry AFO general permit coverage on 10/06/2025.
|
Lowndes
Aluminum Dynamics, LLC, Columbus, MS was granted a new baseline general permit coverage on 10/01/2025.
|
|
Aluminum Dynamics, LLC, Columbus, MS was issued an administrative amendment to their Air Construction PSD permit on 10/08/2025.
|
|
Amrize Cement Inc-Artesia, Artesia, MS was issued an administrative amendment to their water State Operating Permit (SOP) on 09/26/2025.
|
|
Great River Utility Operating Company LLC, Doyle Estates Subdivision, Columbus, MS applied for renewal of their surface water discharge permit (NPDES) on 10/07/2025.
|
|
Tennesse Valley Authority, TVA Lowndes, New Hamilton Project, Caledonia, MS was granted a new constuction general permit coverage on 10/10/2025.
|
Madison
Bainbridge, Canton, MS applied for a new constuction general permit coverage on 10/14/2025.
|
|
Birdsong Construction, County Line Substation, Ridgeland, MS was granted a modification to their construction general permit coverage on 10/07/2025.
|
|
Clark Beverage Group - Canton Facility, Canton, MS was granted a new baseline general permit coverage on 09/25/2025.
|
|
DR Horton, Inc, Birmingham, White Oak Farms, Canton, MS applied for a new constuction general permit coverage on 10/02/2025.
|
|
Hemphill Construction, Pigsah Bottom Road Mine, Canton, MS was granted a new mining general permit coverage on 09/29/2025.
|
|
Livingston Landing, LLC, Livingston Landing Phase 1, Flora, MS was granted a new constuction general permit coverage on 10/09/2025.
|
|
Madison County Economic Development Authority, Madison County Mega Site, Canton, MS applied for a modification to their construction general permit coverage on 09/29/2025.
|
|
WG Yates and Sons Construction Company, JAN 100, Phase III Borrow Area, Canton, MS was granted a new constuction general permit coverage on 09/26/2025.
|
|
Woodgate Developers, LLC, Woodgate Subdivision Phases 1A and 1B, Gluckstadt, MS was granted a modification to their construction general permit coverage on 09/26/2025.
|
Marion
W L Burle Engineers, P A, Coxs Triangle Mini Mart, Foxworth, MS was granted a new underground storage tanks general permit coverage on 10/08/2025.
|
Monroe
Aubrey Silvey Enterprises, Inc, 161-34.5 kV Magnolia Substation, Aberdeen, MS was granted a new constuction general permit coverage on 10/01/2025.
|
|
Monroe County Board of Supervisors, Monroe County Class I Rubbish Site, Aberdeen, MS was issued a modification to their solid waste rubbish permit on 10/02/2025.
|
|
Sterling Specialty Chemicals US LLC, Aberdeen, MS was issued a modification to their Air Synthetic Minor Operating Permit (SMOP) on 10/17/2025.
|
Montgomery
RaceTrac Inc, RaceTrac Winona, Winona, MS was granted a new constuction general permit coverage on 10/09/2025.
|
Newton
Henry Le Farm LLC, Newton, MS was granted a new constuction general permit coverage on 10/03/2025.
|
|
Henry Le Farm LLC, Newton, MS was granted a new Poultry AFO general permit coverage on 10/03/2025.
|
|
Shane Wall, Williams Mine, Hickory, MS was granted a new mining general permit coverage on 10/20/2025.
|
|
Terry Thai, Poultry dba T and M Farms, Union, MS applied for a new Poultry AFO general permit coverage on 10/08/2025.
|
|
Terry Thai, Poultry dba T and M Farms, Union, MS applied for a new constuction general permit coverage on 10/08/2025.
|
Noxubee
Noxubee County Board of Supervisors, Huber Access Road, Shuqualak, MS was granted a new constuction general permit coverage on 10/03/2025.
|
Pearl River
Green Paradise Ranch, LLC, Carriere, MS was issued a new water State Operating Permit (SOP) on 09/29/2025.
|
|
Keet O Gary Construction, LLC, TA Travel Center Poplarville Main Street, Poplarville, MS applied for a new constuction general permit coverage on 10/06/2025.
|
Perry
Jason S and Kelly R Edwards, dba Craz E Farms, Richton, MS applied for a new Poultry AFO general permit coverage on 10/09/2025.
|
|
Jason S and Kelly R Edwards, dba Craz E Farms, Richton, MS applied for a new constuction general permit coverage on 10/09/2025.
|
Pike
W L Byrd Lumber Company Inc, Fernwood, MS was issued a renewal of their surface water discharge permit (NPDES) on 10/06/2025.
|
|
Weyerhaeuser NR Company, McComb Wood Products, Magnolia, MS was issued a renewal of their surface water discharge permit (NPDES) on 10/09/2025.
|
Pontotoc
Ashley Furniture Industries Inc, Ecru Facility, Ecru, MS applied for a new constuction general permit coverage on 10/16/2025.
|
Quitman
Falcon POTW, Falcon, MS applied for renewal of their surface water discharge permit (NPDES) on 09/29/2025.
|
Rankin
Fred Brown, Poultry dba Circle B Farms, Pelahatchie, MS applied for a recoverage of a Poultry AFO general permit on 09/30/2025.
|
|
Reservoir North, LLC, Brandon, MS was granted a modification to their construction general permit coverage on 10/07/2025.
|
|
The Summit at Brandon, LLC, The Summit, Brandon, MS was granted a new constuction general permit coverage on 10/03/2025.
|
|
Vineyard Church of Jackson, Flowood, MS applied for renewal of their Water State Operating Permit (SOP) on 10/14/2025.
|
|
Voith US Inc, Florence, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 09/29/2025.
|
Scott
Biloxi Beach Group Number 1, Morton, MS applied for a water pretreatment permit on 10/21/2025.
|
|
Craig Harrell Poultry, Lena, MS was granted a new constuction general permit coverage on 10/15/2025.
|
|
Craig Harrell Poultry, Lena, MS was granted a new Poultry AFO general permit coverage on 10/15/2025.
|
|
Howard Le, Poultry, Forest, MS was granted a recoverage of a Poultry AFO general permit on 10/01/2025.
|
Smith
Blakes Farm Inc, Mize, MS applied for a new constuction general permit coverage on 09/29/2025.
|
|
Blakes Farm Inc, Mize, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 09/29/2025.
|
|
JB3 Farms LLC, Taylorsville, MS was granted a new constuction general permit coverage on 10/10/2025.
|
|
JB3 Farms LLC, Taylorsville, MS was granted a new Poultry AFO general permit coverage on 10/10/2025.
|
Sunflower
Moon River Foods Inc, Indianola, MS was issued a renewal of their surface water discharge permit (NPDES) on 10/06/2025.
|
Tallahatchie
Glendora POTW, Glendora, MS applied for renewal of their surface water discharge permit (NPDES) on 10/03/2025.
|
|
SRB Aerial Applicators LLC, Charleston, MS applied for renewal of their Water State Operating Permit (SOP) on 10/07/2025.
|
Tate
ABB Inc, Senatobia, MS was granted a new constuction general permit coverage on 10/01/2025.
|
|
EBI, Inc, White Oak Subdivision Section C, Senatobia, MS applied for a new constuction general permit coverage on 09/26/2025.
|
Tippah
Blue Mountain Production Company, Taylor and Plant Property Mine, Blue Mountain, MS applied for renewal of their surface water discharge permit (NPDES) on 10/17/2025.
|
Tishomingo
Fiber Glass Systems LP, Iuka FRP Facility, Iuka, MS was granted a new baseline general permit coverage on 09/25/2025.
|
|
Patrick Industries Inc dba Baymont Industries Plant No. 2, Belmont, MS was issued a new Air Title V Permit on 10/07/2025.
|
|
Patrick Industries, Inc, Baymont Composites, Burnsville, MS was issued a new Air Title V Permit on 10/07/2025.
|
Tunica
Drexel Chemical Company, Tunica, MS applied for renewal of their surface water discharge permit (NPDES) on 09/30/2025.
|
Union
2215 Land LLC, 2215 Commercial, New Albany, MS applied for a new constuction general permit coverage on 09/27/2025.
|
|
Toyota Motor Manufacturing Mississippi Inc, Blue Springs, MS applied for renewal of their Air Title V Permit on 09/30/2025.
|
|
Toyota Motor Manufacturing Mississippi Inc, Blue Springs, MS was issued a renewal of their water pretreatment permit on 10/01/2025.
|
Walthall
Anna Nguyen, Poultry, Tylertown, MS applied for a recoverage of a Poultry AFO general permit on 09/29/2025.
|
|
Charles Ray Polk, Poultry, Tylertown, MS was granted a modification to their Dry Litter Poultry AFO general permit coverage on 10/15/2025.
|
|
Luke Harrison, Poultry dba Lukes Coop, Tylertown, MS was granted a new Poultry AFO general permit coverage on 10/06/2025.
|
Warren
Entergy Mississippi LLC, Baxter Wilson Plant, Vicksburg, MS applied for a new hydrostatic general permit coverage on 09/29/2025.
|
Washington
MacroSource LLC, Greenville North, Greenville, MS was issued a renewal of their Air Synthetic Minor Operating Permit (SMOP) on 10/13/2025.
|
Wayne
Ballard Contractors, Inc, Hood Industries, Waynesboro, MS was granted a new ready mix general permit coverage on 10/15/2025.
|
|
Hood Industries Inc, Waynesboro, Waynesboro, MS was issued a new air construction PSD permit on 10/16/2025.
|
Webster
Cobb Environmental and Technical Services, Inc, Eupora Express, Eupora, MS applied for a new underground storage tanks general permit coverage on 10/01/2025.
|
Winston
Louisville, City of, South Industrial Road Construction, Louisville, MS applied for a new constuction general permit coverage on 10/14/2025.
|
Yalobusha
Enpro Industries Inc, Water Valley, MS applied for renewal of their surface water discharge permit (NPDES) on 10/03/2025.
|