Adams
Natchez Business Ventures LLC, Plantation Mobile Home Park, Natchez, MS applied for renewal of their surface water discharge permit (NPDES) on 09/25/2025.
|
Alcorn
APAC Mississippi Inc, Glen, Glen, MS was issued a renewal of their Water State Operating Permit (SOP) on 09/17/2025.
|
Attala
Attala Steel Industries LLC, Kosciusko, MS was issued a new water pretreatment permit on 09/29/2025.
|
Bolivar
Black and Veatch Corporation, Delta Solar Photovoltaic Generating Facility Project, Cleveland, MS applied for a new constuction general permit coverage on 09/19/2025.
|
McCreary Flying Service LLC, Alligator, MS applied for renewal of their Water State Operating Permit (SOP) on 09/26/2025.
|
Trunkline Gas Company LLC, Shaw Compressor Station, Shaw, MS was issued a renewal of their Water State Operating Permit (SOP) on 09/11/2025.
|
Chickasaw
Prestage Farms Ms Inc B and K Nursery, Woodland, MS was granted an administrative modification to their CAFO general permit coverage on 09/10/2025.
|
Choctaw
Johnny Henson Swine, Weir, MS was granted a renewal to their CAFO general permit coverage on 09/10/2025.
|
Clarke
Dart Container Company of Mississippi LLC, Quitman, MS was issued a renewal of their Air Title V Permit on 09/23/2025.
|
Southern Natural Gas Company LLC, Enterprise Compressor Station, Enterprise, MS applied for renewal of their surface water discharge permit (NPDES) on 09/29/2025.
|
Clay
Owls Head Alloys, West Point, MS was granted a modification to their baseline general permit coverage on 09/23/2025.
|
Coahoma
Coahoma County Utility District Number 2, Bobo POTW, Clarksdale, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/19/2025.
|
Coahoma County Utility District Number 2, Farrell POTW, Farrell, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/18/2025.
|
Copiah
Central MS Rubbish LLC, Crystal Springs, MS applied for a modification to their baseline general permit coverage on 09/15/2025.
|
Covington
Chevron USA, Inc, DBA Chevron Products Company, Collins Terminal, Collins, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 09/26/2025.
|
Kinder Morgan Southeast Terminals LLC, Collins Terminal, Collins, MS was granted a new baseline general permit coverage on 09/25/2025.
|
Desoto
Allen Olive Branch LLC, Kirk Farms, Olive Branch, MS was granted a modification to their construction general permit coverage on 09/11/2025.
|
Land Grant, LLC, Olive Branch Industrial, Olive Branch, MS was granted a new constuction general permit coverage on 10/03/2025.
|
MZX Tech LLC, Southaven, MS applied for a new constuction general permit coverage on 09/19/2025.
|
TVA Southaven Combined Cycle Plant, Southaven, MS was issued a renewal of their Air Title V Permit on 09/23/2025.
|
Yaser Saleh Sal Krown Investment, LLC,Progress Way, Hacks Cross Road Truck Stop, Olive Branch, MS was granted a new constuction general permit coverage on 10/07/2025.
|
Forrest
98 Waste and Recycling, LLC, 98 Waste Class I Rubbish Disposal Site, Hattiesburg, MS was issued an administrative modification to their solid waste rubbish permit on 09/11/2025.
|
98 Waste and Recycling, LLC, 98 Waste Class I Rubbish Disposal Site, Hattiesburg, MS was granted a new baseline general permit coverage on 10/06/2025.
|
Dennis Pierce, Inc, Cedar Crest, Hattiesburg, MS applied for a new constuction general permit coverage on 09/29/2025.
|
USA Yeast Company LLC, Hattiesburg, MS was granted a new baseline general permit coverage on 09/25/2025.
|
George
Redemption Acres LLC, Lucedale, MS was issued a new water State Operating Permit (SOP) on 09/10/2025.
|
Harrison
CCSL Biloxi LLC, dba Gulf Coast Laundry Services, Gulfport, MS applied for renewal of their water pretreatment permit on 09/26/2025.
|
Cavenham Forest Industries LLC, Gulfport, MS applied for renewal of their surface water discharge permit (NPDES) on 09/30/2025.
|
Harrison County Utility Authority, Tradition Development, Woolmarket, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/26/2025.
|
Ixolib Subdivision, Biloxi, MS was granted a modification to their construction general permit coverage on 09/24/2025.
|
MDOT, Gulfport Interconnection Roadway, Gulfport, MS applied for a new constuction general permit coverage on 09/09/2025.
|
Mississippi Power Company, Operations Center, Gulfport, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 09/23/2025.
|
Mississippi Power, MPC PCC 115kV Substation, Pass Christian, MS applied for a new constuction general permit coverage on 09/23/2025.
|
PCC GulfChem Corporation, Pass Christian, MS was issued a new Air Construction Permit on 09/17/2025.
|
Skyline Residential Development, Kingsley Ridge Subdivision Phase 1, Biloxi, MS was granted a new constuction general permit coverage on 09/15/2025.
|
Hinds
Amazon Services LLC, WMS1, Jackson, MS was granted a new baseline general permit coverage on 09/25/2025.
|
Byram, City of, CDBG Drainage Improvements Project, Byram, MS was granted a new constuction general permit coverage on 09/30/2025.
|
Dyas Construction, Inc, UPS Jackson Mississippi, Jackson, MS applied for a new constuction general permit coverage on 09/30/2025.
|
Entergy Corporation, South Utica 6Y03, Utica, MS applied for a modification to their construction general permit coverage on 09/24/2025.
|
Hinds County Economic Development Authority, Delphi Site, Clinton Substation, Clinton, MS applied for a new constuction general permit coverage on 09/23/2025.
|
Hinds County Economic Development Authority, Delphi Site, Clinton Substation, Clinton, MS was granted a new constuction general permit coverage on 10/07/2025.
|
Kirkland Development, Inc, Olde Towne Village, Clinton, MS was granted a new constuction general permit coverage on 09/19/2025.
|
Humphreys
Texas Gas Transmission LLC, Isola Compressor Station, Isola, MS applied for a modification to their air construction permit on 09/12/2025.
|
Jackson
Oak Capital LLC, The Trails, Ocean Springs, MS applied for a new constuction general permit coverage on 09/30/2025.
|
Omega Protein, Inc, Moss Point, MS applied for renewal of their surface water discharge permit (NPDES) on 09/10/2025.
|
Jasper
Denbury Onshore LLC, Heidelberg Central Facility, Heidelberg, MS was granted a new oil production general permit coverage on 09/22/2025.
|
Jefferson
Greenway Environmental Services LLC, Greenway Environmental Services Landfill, Fayette, MS applied for renewal of their Air Title V Permit on 09/09/2025.
|
Jones
Jones Family Farm LLC, Seminary, MS was granted a modification to their Dry Litter Poultry AFO general permit coverage on 09/15/2025.
|
Patterson Farms LLC, Moselle, MS applied for a new Poultry AFO general permit coverage on 09/19/2025.
|
Kemper
Kemper County Landfill Company, LLC, a subsidiary of Waste Pro of Mississippi Inc, DeKalb, MS applied for a modification to their solid waste municipal landfill permit on 09/29/2025.
|
Tennessee Valley Authority, TVA, Kemper Combustion Turbine Plant, Dekalb, MS was issued a renewal of their Air Title V Permit on 09/23/2025.
|
Lafayette
L and M Holdings LLC, Lafayette Landing Subdivision, Oxford, MS was granted a new constuction general permit coverage on 10/01/2025.
|
Oxford, City of, Oxford Class I Rubbish Site, Oxford, MS was granted a modification to their baseline general permit coverage on 09/10/2025.
|
Lamar
Lamar County School District, Oak Grove High School, Hattiesburg, MS was issued a renewal of their Water State Operating Permit (SOP) on 09/25/2025.
|
Lamar County School District, Sumrall High School, Sumrall, MS was granted a new constuction general permit coverage on 09/24/2025.
|
Lauderdale
MMC Materials Inc, Meridian Portable Plant, Meridian, MS was granted a new ready mix general permit coverage on 09/15/2025.
|
Mid South Lumber Inc, Meridian, MS was issued a renewal of their Air Title V Permit on 09/16/2025.
|
QuikTrip Corporation, QuikTrip 7257, Meridian, MS was granted a new constuction general permit coverage on 10/06/2025.
|
Tennessee Gas Pipeline Company, TGP 500 Lines Replacement at Hognose Creek, Meridian, MS was granted a new hydrostatic general permit coverage on 09/17/2025.
|
Lee
Auto Parts Manufacturing Mississippi Inc, Guntown, MS was issued a renewal of their water pretreatment permit on 10/01/2025.
|
Lee County Board of Supervisors, Lee County Adult Detention Center, Tupelo, MS was granted a new constuction general permit coverage on 09/17/2025.
|
Sunshine Mills Inc, Tupelo, MS applied for a modification to their Air Synthetic Minor Operating Permit (SMOP) on 09/24/2025.
|
Tupelo Airport Authority, Tupelo, MS applied for a new baseline general permit coverage on 09/09/2025.
|
Tupelo Airport Authority, Tupelo, MS was granted a new baseline general permit coverage on 09/25/2025.
|
Lincoln
Brookhaven POTW, Brookhaven, MS applied for renewal of their surface water discharge permit (NPDES) on 09/12/2025.
|
Country Meat Market of Brookhaven Inc, Brookhaven, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/29/2025.
|
Miskelly Farm LLC, Ruth, MS was granted a new constuction general permit coverage on 10/06/2025.
|
Miskelly Farm LLC, Ruth, MS was granted a new Poultry AFO general permit coverage on 10/06/2025.
|
Phillips Bark Processing Company Inc, Processing Facility, Brookhaven, MS was issued a renewal of their solid waste processing permit on 09/16/2025.
|
Lowndes
APAC Mississippi Inc, Columbus, Columbus, MS was issued a renewal of their Water State Operating Permit (SOP) on 09/17/2025.
|
Aaron Koehn, Poultry dba Plum Grove Farms, Columbus, MS applied for a new constuction general permit coverage on 09/12/2025.
|
Aaron Koehn, Poultry dba Plum Grove Farms, Columbus, MS applied for a new Poultry AFO general permit coverage on 09/12/2025.
|
Aluminum Dynamics, LLC, Columbus, MS was granted a new baseline general permit coverage on 10/01/2025.
|
Amrize Cement Inc-Artesia, Artesia, MS was issued an administrative amendment to their water State Operating Permit (SOP) on 09/26/2025.
|
PACCAR Engine Company, Columbus, MS applied for a Air Synthetic Minor Operating Permit (SMOP) on 09/12/2025.
|
Madison
Birdsong Construction, County Line Substation, Ridgeland, MS was granted a modification to their construction general permit coverage on 10/07/2025.
|
Clark Beverage Group - Canton Facility, Canton, MS was granted a new baseline general permit coverage on 09/25/2025.
|
DR Horton, Inc, Birmingham, White Oak Farms, Canton, MS applied for a new constuction general permit coverage on 10/02/2025.
|
Delta Industries, Inc., AWS, Canton, MS was granted a new ready mix general permit coverage on 09/15/2025.
|
Hemphill Construction, Pigsah Bottom Road Mine, Canton, MS was granted a new mining general permit coverage on 09/29/2025.
|
Highland Park Properties, Bob Lloyd Commercial Property, Canton, MS applied for a new constuction general permit coverage on 09/24/2025.
|
Highland Park Properties, LLC, Movie Town RV Park, Canton, MS was granted a new constuction general permit coverage on 09/17/2025.
|
L H Harris Construction, LLC, McMillon Road Surface Mine, Madison, MS applied for a new mining general permit coverage on 09/17/2025.
|
Madison Avenue Land, LLC, Park Hill, Madison, MS was granted a new constuction general permit coverage on 09/19/2025.
|
Madison County Economic Development Authority, Madison County Mega Site, Canton, MS applied for a modification to their construction general permit coverage on 09/29/2025.
|
Madison County Economic Development Authority, Project X, Ridgeland, MS was granted a modification to their construction general permit coverage on 09/15/2025.
|
Mission Park Development, LLC , Mission Park, Phase 1, Gluckstadt, MS applied for a modification to their construction general permit coverage on 09/22/2025.
|
The Haskell Company, JAN 200 Haskell, Ridgeland, MS was granted a new constuction general permit coverage on 09/15/2025.
|
WG Yates and Sons Construction Company, JAN 100, Phase III Borrow Area, Canton, MS applied for a new constuction general permit coverage on 09/17/2025.
|
WG Yates and Sons Construction Company, JAN 100, Phase III Borrow Area, Canton, MS was granted a new constuction general permit coverage on 09/26/2025.
|
Woodgate Developers, LLC, Woodgate Subdivision Phases 1A and 1B, Gluckstadt, MS was granted a modification to their construction general permit coverage on 09/26/2025.
|
Marion
MC Environmental LLC, Columbia, MS was issued a new solid waste rubbish permit on 09/12/2025.
|
W L Burle Engineers, P A, Coxs Triangle Mini Mart, Foxworth, MS applied for a new underground storage tanks general permit coverage on 09/15/2025.
|
Marshall
Pond Constructors Inc, Project EXO, Byhalia, MS was granted a new constuction general permit coverage on 09/12/2025.
|
Serenity Funeral Home LLC, Holly Springs, MS was issued a new Air Construction Permit on 09/17/2025.
|
Monroe
Aubrey Silvey Enterprises, Inc, 161-34.5 kV Magnolia Substation, Aberdeen, MS was granted a new constuction general permit coverage on 10/01/2025.
|
Monroe County Board of Supervisors, Monroe County Class I Rubbish Site, Aberdeen, MS was issued a modification to their solid waste rubbish permit on 10/02/2025.
|
Neshoba
Fairview RV Resort LLC, Philadelphia, MS applied for renewal of their Water State Operating Permit (SOP) on 09/15/2025.
|
Neshoba County Board of Supervisors, Burnside Park Restroom, Philadelphia, MS applied for a water State Operating Permit (SOP) on 09/15/2025.
|
Newton
Dustin Richmond Poultry, Lawrence, MS was granted a recoverage of a Poultry AFO general permit on 09/15/2025.
|
Henry Le Farm LLC, Newton, MS was granted a new constuction general permit coverage on 10/03/2025.
|
Henry Le Farm LLC, Newton, MS was granted a new Poultry AFO general permit coverage on 10/03/2025.
|
Noxubee
Kyle Mininger, Poultry dba Cedar Creek Farm, Brooksville, MS applied for a new Poultry AFO general permit coverage on 09/08/2025.
|
Kyle Mininger, Poultry dba Cedar Creek Farm, Brooksville, MS applied for a new constuction general permit coverage on 09/08/2025.
|
Lynn Seiler Poultry, Macon, MS applied for a new constuction general permit coverage on 09/09/2025.
|
Lynn Seiler Poultry, Macon, MS applied for a new Poultry AFO general permit coverage on 09/09/2025.
|
Noxubee County Board of Supervisors, Huber Access Road, Shuqualak, MS was granted a new constuction general permit coverage on 10/03/2025.
|
Ricky Wiebe dba Fox Chase Poultry, Macon, MS applied for a new Poultry AFO general permit coverage on 09/09/2025.
|
Shuqualak Lumber Company Inc, Planer Mill Division, Shuqualak, MS applied for renewal of their surface water discharge permit (NPDES) on 09/08/2025.
|
Oktibbeha
Global Methodist Church, Starkville, MS applied for a new constuction general permit coverage on 09/22/2025.
|
Greystar, College View at Mississippi State University, Starkville, MS applied for a new constuction general permit coverage on 09/12/2025.
|
Starkville POTW, Starkville, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/18/2025.
|
Pearl River
Green Paradise Ranch, LLC, Carriere, MS was issued a new water State Operating Permit (SOP) on 09/29/2025.
|
Pearl River County Board of Supervisors, Walkiah Bluff, Picayune, MS was granted a new constuction general permit coverage on 09/24/2025.
|
R and J Construction, Highway 26 Mine, Poplarville, MS applied for a new mining general permit coverage on 09/12/2025.
|
Pike
Dawtchinsung Thawng dba Thawng Farm, McComb, MS was granted a new Poultry AFO general permit coverage on 09/17/2025.
|
LV Petroleum LLC TA McComb, McComb, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/12/2025.
|
Rankin
Freedoms Image LLC, Freedom Farms Phase Four, Brandon, MS was granted a modification to their construction general permit coverage on 09/24/2025.
|
Pinelands LLC, Flowood, MS was granted a modification to their construction general permit coverage on 09/09/2025.
|
Reservoir North, LLC, Brandon, MS was granted a modification to their construction general permit coverage on 10/07/2025.
|
Terra Renewal Services Inc, Rankin County Land Application Sites, Pelahatchie, MS was issued a renewal of their solid waste land application permit on 09/17/2025.
|
The Summit at Brandon, LLC, The Summit, Brandon, MS was granted a new constuction general permit coverage on 10/03/2025.
|
Voith US Inc, Florence, MS applied for renewal of their Air Synthetic Minor Operating Permit (SMOP) on 09/29/2025.
|
Scott
Central Industries Inc, dba River Valley Ingredients, Forest, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/17/2025.
|
Forest POTW, Forest, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/16/2025.
|
Howard Le, Poultry, Forest, MS applied for a recoverage of a Poultry AFO general permit on 09/15/2025.
|
Howard Le, Poultry, Forest, MS was granted a recoverage of a Poultry AFO general permit on 10/01/2025.
|
Smith
Blakes Farm Inc, Mize, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 09/29/2025.
|
Blakes Farm Inc, Mize, MS applied for a new constuction general permit coverage on 09/29/2025.
|
JB3 Farms LLC, Taylorsville, MS applied for a new Poultry AFO general permit coverage on 09/16/2025.
|
JB3 Farms LLC, Taylorsville, MS applied for a new constuction general permit coverage on 09/16/2025.
|
Sunflower
Moon River Foods Inc, Indianola, MS was issued a renewal of their surface water discharge permit (NPDES) on 10/06/2025.
|
Tate
ABB Inc, Senatobia, MS was granted a new constuction general permit coverage on 10/01/2025.
|
Atmos Energy, Coldwater Line, Coldwater, MS was granted a new constuction general permit coverage on 09/10/2025.
|
Baker Farms, Scott Street, Senatobia, MS applied for a new constuction general permit coverage on 09/18/2025.
|
EBI, Inc, White Oak Subdivision Section C, Senatobia, MS applied for a new constuction general permit coverage on 09/26/2025.
|
Senatobia POTW, Senatobia, MS was granted a new constuction general permit coverage on 09/10/2025.
|
Tate County Board of Supervisors, Tate County Fire Training Facility Site, Senatobia, MS was granted a new constuction general permit coverage on 09/17/2025.
|
Tippah
Northeast Mississippi Solid Waste Management Authority, Northeast Mississippi Regional Landfill, Walnut, MS was issued a renewal of their surface water discharge permit (NPDES) on 09/08/2025.
|
Northeast Mississippi Solid Waste Management Authority, Northeast Mississippi Regional Landfill, Walnut, MS was issued a renewal of their water pretreatment permit on 09/08/2025.
|
Tishomingo
Fiber Glass Systems LP, Iuka FRP Facility, Iuka, MS was granted a new baseline general permit coverage on 09/25/2025.
|
Patrick Industries Inc dba Baymont Industries Plant No. 2, Belmont, MS was issued a new Air Title V Permit on 10/07/2025.
|
Patrick Industries, Inc, Baymont Composites, Burnsville, MS was issued a new Air Title V Permit on 10/07/2025.
|
Tunica
Magnolia Processing Inc, Pride Of The Pond, Tunica, MS was issued a renewal of their Water State Operating Permit (SOP) on 09/08/2025.
|
Union
2215 Land LLC, 2215 Commercial, New Albany, MS applied for a new constuction general permit coverage on 09/27/2025.
|
Toyota Motor Manufacturing Mississippi Inc, Blue Springs, MS applied for renewal of their Air Title V Permit on 09/30/2025.
|
Toyota Motor Manufacturing Mississippi Inc, Blue Springs, MS was issued a renewal of their water pretreatment permit on 10/01/2025.
|
Value Needed
Gulf South Pipeline Company LLC, Holmes Compressor Station, , MS applied for a air construction permit on 09/12/2025.
|
Gulf South Pipeline Company LLC, Kosciusko Compressor Station, , MS applied for a air construction permit on 09/12/2025.
|
Walthall
Anna Nguyen, Poultry, Tylertown, MS applied for a recoverage of a Poultry AFO general permit on 09/29/2025.
|
Luke Harrison, Poultry dba Lukes Coop, Tylertown, MS was granted a new Poultry AFO general permit coverage on 10/06/2025.
|
Persimmon Hill Poultry LLC, Tylertown, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 09/08/2025.
|
Warren
EAE-Vicksburg T-2, Vicksburg, MS was issued an administrative amendment to their Air Title V permit on 09/09/2025.
|
Washington
Tennessee Gas Pipeline Company, LLC, TGP DIP 9 SP Replacement, Greenville, MS was granted a new hydrostatic general permit coverage on 09/17/2025.
|
Texas Gas Transmission LLC, Greenville Compressor Station, Greenville, MS applied for a modification to their Air Title V Permit on 09/12/2025.
|
USG Interiors LLC, Greenville, MS was issued a renewal of their Air Title V Permit on 09/09/2025.
|
Wayne
Ballard Contractors, Inc, Hood Industries, Waynesboro, MS applied for a new ready mix general permit coverage on 09/08/2025.
|