Waste Management of Mississippi Inc, Plantation Oaks Landfill and Recycling Center, Natchez Hauling, Sibley, MS was issued a renewal of their water pretreatment permit on 05/04/2026.


Alcorn

Caterpillar Inc, Corinth, MS applied for renewal of their water pretreatment permit on 05/19/2026.

Rienzi POTW, Rienzi, MS applied for renewal of their surface water discharge permit (NPDES) on 04/29/2026.


Attala

Zo Muan Poultry, Kosciusko, MS was granted an administrative modification to their Dry Litter Poultry AFO general permit coverage on 05/07/2026.


Bolivar

US Army COE, Vicksburg District, Contract W912EE26FA05 611 Berms, Perthshire, MS applied for a new constuction general permit coverage on 05/19/2026.


Calhoun

Weyerhaeuser NR Company, Bruce Facility, Bruce, MS applied for renewal of their water pretreatment permit on 05/22/2026.


Claiborne

Entergy Operations Inc, Grand Gulf Nuclear Station, Port Gibson, MS was issued a renewal of their surface water discharge permit (NPDES) on 05/22/2026.


Clay

Prestage Farms Mississippi Inc, Feed Mill, West Point, MS applied for renewal of their Water State Operating Permit (SOP) on 05/13/2026.


Coahoma

Clarksdale Public Utilities, Crossroads Energy Center, Clarksdale, MS was issued a renewal of their water pretreatment permit on 05/04/2026.

Lyon POTW, Lyon, MS applied for renewal of their surface water discharge permit (NPDES) on 05/22/2026.


Copiah

Central MS Rubbish LLC, Crystal Springs, MS was issued a modification to their solid waste rubbish permit on 04/28/2026.


Covington

Conner Harrell dba Harrell Poultry Farm, Mount Olive, MS applied for a new Poultry AFO general permit coverage on 04/29/2026.

Conner Harrell dba Harrell Poultry Farm, Mount Olive, MS applied for a new constuction general permit coverage on 04/29/2026.

Lazy C Farms LLC, Collins, MS was granted a new constuction general permit coverage on 05/19/2026.

Lazy C Farms LLC, Collins, MS was granted a new Poultry AFO general permit coverage on 05/19/2026.

Michael S Duckworth, Poultry, Seminary, MS was granted a modification to their Dry Litter Poultry AFO general permit coverage on 04/28/2026.


Desoto

Allen Olive Branch LLC, Kirk Farms, Olive Branch, MS was granted a modification to their construction general permit coverage on 04/30/2026.

Hubbell Incorporated dba DMC Power, Inc., Olive Branch, Olive Branch, MS was granted a new baseline general permit coverage on 05/18/2026.

MZX Tech LLC, Southaven, MS applied for a water pretreatment permit on 05/13/2026.

Overland Contracting Inc, Entergy Penton Solar Photovoltaic Generating Facility Project, Lake Cormorant, MS was granted a modification to their construction general permit coverage on 05/15/2026.

South Cherry Tree Development, Inc, Center Hill Farms Planned Development, Olive Branch, MS applied for a modification to their asphalt general permit coverage on 05/06/2026.


Forrest

Lamar County School District, Oak Grove Middle School, Hattiesburg, MS was granted a new constuction general permit coverage on 05/15/2026.


George

Anderson Construction LLC, Old 63 Square, Lucedale, MS applied for a modification to their construction general permit coverage on 04/28/2026.

DR Horton Inc, Mississippi Mobile Division DR Horton Magnolia Farms, Lucedale, MS was granted a modification to their construction general permit coverage on 05/14/2026.


Greene

Stanley Brewer, Poultry dba Brewer Farms, Richton, MS was granted a modification to their Dry Litter Poultry AFO general permit coverage on 05/07/2026.

True Vine Farmstead LLC, Richton, MS was granted a new constuction general permit coverage on 05/05/2026.

True Vine Farmstead LLC, Richton, MS was granted a new Poultry AFO general permit coverage on 05/05/2026.


Hancock

Ava Tellus Diamondhead North, LLC, Diamondhead, MS applied for a new constuction general permit coverage on 05/07/2026.

Hancock County Port and Harbor Commission, Port Bienville Site 1 and Site 6, Bay St. Louis, MS applied for a new constuction general permit coverage on 05/11/2026.

Shieldsboro Subdivision, Bay St. Louis, MS applied for a new constuction general permit coverage on 04/27/2026.


Harrison

Kaliber Management LLC, Ridgecrest Estates Mobile Home Park, Gulfport, MS was issued an administrative amendment to their surface water discharge permit (NPDES) on 05/12/2026.

MDOT, Gulfport Interconnection Roadway, Gulfport, MS was granted a new constuction general permit coverage on 05/12/2026.

Magnolia Walk Subdivision, Pass Christian, MS applied for a modification to their construction general permit coverage on 04/27/2026.

Material Supply LLC, Gulfport, MS applied for a new baseline general permit coverage on 05/05/2026.

ONYX Construction Management, LLC, ATCH01 FamCamp II Remediation, Biloxi, MS was granted a new constuction general permit coverage on 04/30/2026.

Taber Extrusions LLC, Gulfport, MS applied for a modification to their baseline general permit coverage on 04/30/2026.


Hinds

Alston Construction Company, Inc, Project Delphi, Project Atlas, Clinton, MS was granted a modification to their construction general permit coverage on 05/14/2026.

Atmos Energy, Robinson Road Gas Pipeline, Clinton, MS was granted a new constuction general permit coverage on 05/06/2026.

Bruenberg LLC, Salus Ridge of Bruenberg, Clinton, MS was granted a new constuction general permit coverage on 05/04/2026.

Bruenburg LLC, Stoneburne IV of Bruenburg, Clinton, MS was granted a new constuction general permit coverage on 04/30/2026.

Bruenburg LLC, Wellbridge of Bruenburg, Clinton, MS was granted a new constuction general permit coverage on 05/04/2026.

City of Byram, Nature Park and Soccer Fields, Byram, MS applied for a new constuction general permit coverage on 04/28/2026.

Darling Ingredients Inc, Jackson, MS was issued a renewal of their water pretreatment permit on 05/13/2026.

Illinois Central Railroad Company CN, Jackson, MS was issued a renewal of their water pretreatment permit on 05/20/2026.


Humphreys

Silver City POTW, Silver City, MS applied for renewal of their surface water discharge permit (NPDES) on 05/06/2026.


Itawamba

MDOT, Highway 78, Welcome Center, Itawamba, Tremont, MS was issued a renewal of their surface water discharge permit (NPDES) on 05/13/2026.

Toyota Boshoku Mississippi LLC, Mantachie, MS was issued a modification to their Air Synthetic Minor Operating Permit (SMOP) on 05/01/2026.


Jackson

BWC Terminals LLC, Pascagoula Facility, Pascagoula, MS applied for a new hydrostatic general permit coverage on 05/08/2026.

BWC Terminals LLC, Pascagoula Facility, Pascagoula, MS was granted a new hydrostatic general permit coverage on 05/11/2026.


Jasper

Jared Windham, Poultry, Bay Springs, MS applied for a modification to their Dry Litter Poultry AFO general permit coverage on 04/24/2026.


Jefferson Davis

Chance Harrison Farms LLC, Prentiss, MS was granted a new Poultry AFO general permit coverage on 04/28/2026.

Chance Harrison Farms LLC, Prentiss, MS was granted a new constuction general permit coverage on 04/28/2026.

The Chick Inn Farms LLC dba Kim Farms, Bassfield, MS was granted a new Poultry AFO general permit coverage on 05/19/2026.

The Chick Inn Farms LLC dba Kim Farms, Bassfield, MS was granted a new constuction general permit coverage on 05/19/2026.


Jones

Products SE Pipe Line Corporation, MS EXP 0053/0061/0037 Mill Creek, Taylorsville, MS applied for a new hydrostatic general permit coverage on 05/14/2026.


Lafayette

Lafayette County Board of Supervisors, Industrial Park Grading and Road Improvements, Oxford, MS applied for a new constuction general permit coverage on 04/30/2026.

Lamar Lakes, Oxford, MS was granted a new constuction general permit coverage on 04/28/2026.

Olin Winchester LLC, Oxford, MS applied for a modification to their Air Synthetic Minor Operating Permit (SMOP) on 05/01/2026.


Lamar

Great River Utility Operating Company LLC, Forrest Hills Subdivision, Oak Grove, MS applied for renewal of their surface water discharge permit (NPDES) on 05/04/2026.


Lauderdale

Lotus Pines LLC, The Pines of Meridian, Meridian, MS applied for a new constuction general permit coverage on 05/06/2026.


Lawrence

Mountain View Farms, LLC, Monticello, MS applied for a new constuction general permit coverage on 04/24/2026.


Leake

Dickerson and Bowen Inc, Carthage Asphalt Plant #4, Carthage, MS applied for a modification to their asphalt general permit coverage on 05/13/2026.


Lee

DUN-N-1 Travel Center, LLC, DUN-N-1 Travel Center, Tupelo, MS applied for a new constuction general permit coverage on 05/07/2026.

Independent Furniture Supply Company, Inc. - Plant Number 6, Sherman, MS was issued an administrative amendment to their Air Synthetic Minor Operation Permit on 04/24/2026.

Sunshine Mills Inc, Tupelo, MS was issued a modification to their Air Synthetic Minor Operating Permit (SMOP) on 05/21/2026.


Lincoln

Rex Lumber, Brookhaven LLC, Brookhaven, MS applied for renewal of their Air Title V Permit on 04/30/2026.


Lowndes

Steel Dynamics, Project Phoenix, Columbus, MS was granted a new constuction general permit coverage on 04/28/2026.


Madison

Amazon Data Services, Inc, MCEDA Jan 100, Phase II and III, Canton, MS was granted a modification to their construction general permit coverage on 05/13/2026.

Arrowhead Investments, LLC, Madisonville, Phase 1, Canton, MS applied for a modification to their asphalt general permit coverage on 04/24/2026.

Birdsong Construction, County Line Substation, Ridgeland, MS was granted a modification to their construction general permit coverage on 04/28/2026.

Christ Covenant School, LLC, CSC Baseball Field, Ridgeland, MS was granted a new constuction general permit coverage on 04/30/2026.

Entergy Mississippi LLC, Traceview Advanced Power Station, Ridgeland, MS was granted an administrative modification to their Construction general permit coverage on 05/07/2026.

Entergy Mississippi, LLC, Entergy County Line Substation, Project Atlas, Ridgeland, MS was granted a new constuction general permit coverage on 04/28/2026.

Madison County Economic Development Authority, Madison County Mega Site, Canton, MS was granted a new constuction general permit coverage on 05/13/2026.

Ratliff NCS LLC, Ratliff Ferry RV Park, Canton, MS applied for a new constuction general permit coverage on 05/08/2026.

Waggoner Engineering, West County Line Water Supply Well & Water Distribution Improvements, Ridgeland, MS applied for a new constuction general permit coverage on 05/06/2026.


Marshall

Chickasaw Marshall Investments, LLC, Chickasaw Business Center, Byhalia, MS applied for a modification to their construction general permit coverage on 05/05/2026.

Porter Construction MS LLC, Twin Lakes Subdivision, Mount Pleasant, MS applied for a modification to their construction general permit coverage on 05/06/2026.


Monroe

Atmos Energy, Hamilton SIMP Highway 45, Aberdeen, MS was granted a new constuction general permit coverage on 05/13/2026.

Monroe Gas Storage Company LLC, Monroe Gas Storage Facility, Amory, MS applied for a Air Title V Permit on 05/12/2026.

Warren Giesbrecht, Poultry dba Spring Creek Poultry, Aberdeen, MS was granted a new Poultry AFO general permit coverage on 05/12/2026.


Newton

Blake Germany Broiler Farm, Union, MS was granted a new constuction general permit coverage on 05/21/2026.

Blake Germany Broiler Farm, Union, MS was granted a new Poultry AFO general permit coverage on 05/21/2026.

Thang Hnin dba Hnin Poultry, Union, MS applied for a recoverage of a Poultry AFO general permit on 05/13/2026.

Thang Hnin dba Hnin Poultry, Union, MS was granted a recoverage of a Poultry AFO general permit on 05/14/2026.


Noxubee

Andrew Unruh Farm, Brooksville, MS was granted a new Poultry AFO general permit coverage on 05/14/2026.

Andrew Unruh Farm, Brooksville, MS was granted a new constuction general permit coverage on 05/14/2026.

Barge Forest Products Company, Macon, MS applied for renewal of their surface water discharge permit (NPDES) on 05/04/2026.

Fred Johnson, Poultry, Macon, MS applied for a new Poultry AFO general permit coverage on 04/24/2026.

Fred Johnson, Poultry, Macon, MS applied for a new constuction general permit coverage on 04/24/2026.

Indian Creek Farm Inc, Macon, MS was granted a new constuction general permit coverage on 05/14/2026.

Indian Creek Farm Inc, Macon, MS was granted a new Poultry AFO general permit coverage on 05/14/2026.

Macon Treating Company, Macon, MS was issued a renewal of their surface water discharge permit (NPDES) on 05/18/2026.

Rigdon Poultry, LLC, Shuqualak, MS was granted a new constuction general permit coverage on 05/21/2026.

Rigdon Poultry, LLC, Shuqualak, MS was granted a new Poultry AFO general permit coverage on 05/21/2026.


Oktibbeha

Atmos Energy Corporation, Pheba to Starkville Gas Line, Starkville, MS applied for a new constuction general permit coverage on 04/24/2026.

Beacon Place, Starkville, MS applied for a new constuction general permit coverage on 05/08/2026.

Greystar, College View at Mississippi State University, Starkville, MS was granted a new constuction general permit coverage on 05/14/2026.


Panola

Creekstand Holdings, LLC, Good Hope Dam, Batesville, MS was granted a new constuction general permit coverage on 05/08/2026.

The Korex Corporation, Korex Sardis Facility, Sardis, MS applied for a air construction permit on 05/05/2026.

The Korex Corporation, Korex Sardis Facility, Sardis, MS applied for a water pretreatment permit on 05/06/2026.

Underground Solutions, Batesville, MS was granted a new constuction general permit coverage on 04/28/2026.

Yancey Brothers Company dba Yancey Engineered Solutions, Batesville, MS was granted a new constuction general permit coverage on 05/22/2026.


Perry

New Augusta POTW, New Augusta, MS applied for renewal of their surface water discharge permit (NPDES) on 05/18/2026.


Pike

Hniang Mang Poultry, Magnolia, MS was granted a modification to their Dry Litter Poultry AFO general permit coverage on 05/04/2026.

Illinois Central Railroad Company CN, McComb Yard, McComb, MS applied for renewal of their surface water discharge permit (NPDES) on 05/05/2026.


Pontotoc

Hickory Crest Estates Utility Company LLC, Pontotoc, MS was issued a renewal of their surface water discharge permit (NPDES) on 05/15/2026.

VBM ThreeRivers LLC, VBM Three Rivers, Pontotoc, MS was issued a new Air Construction Permit on 05/07/2026.


Rankin

International Paper Company, Brandon Facility, Brandon, MS applied for a air construction permit on 05/01/2026.

Jackson Municipal Airport Authority, Jackson-Evers International Airport, Jackson, MS applied for a modification to their construction general permit coverage on 04/29/2026.

MDOT, Rankin, 104101 302000, Flowood, MS was granted a new constuction general permit coverage on 04/28/2026.

Rankin First Economic Development Authority, Blue Horizon, Pearl, MS was granted an administrative modification to their Construction general permit coverage on 05/08/2026.

Rankin First Economic Development Authority, Blue Horizon, Pearl, MS was granted an administrative modification to their Construction general permit coverage on 05/08/2026.


Scott

Denali Water Solutions LLC, Scott County Land Application Sites, Forest, MS was issued a new solid waste land application permit on 05/12/2026.

Steve Windham, Poultry, Lake, MS applied for a recoverage of a Poultry AFO general permit on 05/05/2026.

William Garner Poultry, Morton, MS was granted a modification to their Dry Litter Poultry AFO general permit coverage on 04/24/2026.

William Garner Poultry, Morton, MS was granted a new constuction general permit coverage on 04/24/2026.


Smith

Taylorsville POTW, Taylorsville, MS applied for renewal of their surface water discharge permit (NPDES) on 05/13/2026.

Winston B Hollingsworth, Poultry dba Hollingsworth Farm, Mize, MS was granted a new constuction general permit coverage on 05/04/2026.

Winston B Hollingsworth, Poultry dba Hollingsworth Farm, Mize, MS was granted a new Poultry AFO general permit coverage on 05/04/2026.


Stone

Complete Paper Wiggins LLC, Wiggins, MS applied for a water State Operating Permit (SOP) on 04/28/2026.

Hood Industries Inc, Wiggins Plywood Plant, Wiggins, MS applied for renewal of their Water State Operating Permit (SOP) on 05/05/2026.


Tate

B5 Developments, Langley Estates, Senatobia, MS was granted a new constuction general permit coverage on 05/21/2026.

M & K Investments LLC, Strayhorn Tire Recyclers, Sarah, MS was issued a new waste tire processor permit on 05/18/2026.

OCM USA LLC, Plant 2, Senatobia, MS was granted a new baseline general permit coverage on 04/30/2026.


Tippah

EcoWater Systems LLC, Ripley, MS applied for a modification to their water pretreatment permit on 05/15/2026.


Tishomingo

Burnsville POTW, Burnsville, MS applied for renewal of their surface water discharge permit (NPDES) on 05/06/2026.

Elk Landing Inc, Elks Club Landing, Iuka, MS was issued a renewal of their Water State Operating Permit (SOP) on 05/22/2026.

Tishomingo County Board of Supervisors, Tri State Commerce Park, Iuka, MS applied for renewal of their surface water discharge permit (NPDES) on 05/11/2026.


Walthall

Gut to Grind, LLC, Tylertown, MS was issued a new water State Operating Permit (SOP) on 04/28/2026.

Transcontinental Gas Pipeline Company LLC, Station 70, Tylertown, MS applied for renewal of their surface water discharge permit (NPDES) on 04/28/2026.


Warren

Entergy Mississippi LLC, Vicksburg Advanced Power Station (VAPS), Vicksburg, MS was issued a new water pretreatment permit on 05/07/2026.

Vicksburg Petroleum Products LLC, Vicksburg, MS was granted a new constuction general permit coverage on 04/24/2026.

Vicksburg Shipyard, LLC, Vicksburg, MS applied for a modification to their baseline general permit coverage on 05/07/2026.


Washington

ANR Pipeline Company, Greenville Compressor Station, Greenville, MS applied for renewal of their surface water discharge permit (NPDES) on 05/11/2026.

KM Mississippi Intrastate System LLC, Delta blues Compressor Station, Greenville, MS was issued a new Air Construction Permit on 05/21/2026.

Richard Baughn Construction, Inc, Greer Solar Switch Station, Hollandale, MS applied for a new ready mix general permit coverage on 05/05/2026.


Wayne

Dewayne Pryor, Poultry dba Circle P Farms, Laurel, MS applied for a new Poultry AFO general permit coverage on 04/24/2026.

Scotch Plywood Company Inc, Waynesboro, MS applied for a water State Operating Permit (SOP) on 05/18/2026.

Venture Oil and Gas Inc, Hiwannee Operations, Waynesboro, MS was issued a renewal of their Air Title V Permit on 05/07/2026.


Winston

KCP Farm LLC, Philadelphia, MS was granted a modification to their Dry Litter Poultry AFO general permit coverage on 04/28/2026.


Yalobusha

Talbot Brothers Grading Co, Hwy 9 Mine, Water Valley, MS applied for a new mining general permit coverage on 05/01/2026.


Yazoo

HighMark Energy Operating, LLC, Tinsley Test Site Number 6, Tinsley, MS was granted an administrative modification to their oil production general permit coverage on 05/21/2026.

« enSearch Online - Home

Disclaimer: The information found in enSearch Online is for informational purposes only. While the Department makes reasonable efforts to maintain the data accurately and in a timely manner, enSearch Online is not a legal substitute for the official administrative files of the Department and will from time to time contain information that is not as complete as the information contained in the full administrative file of the agency. Additionally, typographical errors may occur in the transcription of written or typed information into the enSearch Online database; therefore, care should be taken to confirm the information in the database with information in the agency's administrative files. If any conflict exists between information contained in the enSearch Online database and the official administrative files of the Department, the official administrative files of the Department should be considered the official record. Nor is the posting of information on enSearch Online intended to replace the traditional methods of publishing public notice of certain documents as required by State and Federal statutes and/or regulations. EnSearch Online is intended to enhance the public's access to basic agency information. If you wish to review the official public records of the Department, you should contact the Public Records Officer of the Department at :
attn:Public Records Officer,
Mississippi Department of Environmental Quality

PO Box 2261,
Jackson, MS 39225-2261,
Phone Number (601) 961-5758 or
(601) 961-5171,
Fax Number (601) 354-6356.